Controlled-Release Moth Mating Disruption Lure

Product family: Biodegradable Dispensers.

Flow: Synthesized Lepidoptera Pher → Precision Active Micro-Blend → Twin-Tube Co-Extrusion Cap → Automated Heat-Crimped Cut → GC Active Loading Verification → Refrigerated Foil Pouch Box → Apple & Vineyard Estates

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Controlled-Release Moth Mating Disruption LureSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Synthesized Lepidoptera Pher → Precision Active Micro-Blend (1.2 s) → Twin-Tube Co-Extrusion Cap (1.2 s) → Automated Heat-Crimped Cut (1.2 s) → GC Active Loading Verification (1.2 s) → Refrigerated Foil Pouch Box (1.2 s) → Apple & Vineyard Estates.SUPPLIERSynthesizedLepidopteraPherI1.60 d1Precision ActiveMicro-BlendC/T 1.2 sI1.80 d2Twin-TubeCo-Extrusion CapC/T 1.2 sI2.00 d3AutomatedHeat-Crimped CutC/T 1.2 sI1.00 d4GC Active LoadingVerificationC/T 1.2 sI1.20 d5Refrigerated FoilPouch BoxC/T 1.2 sI2.20 dCUSTOMERApple &Vineyard…48,000 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Precision Active Micro-Blend1.2 s30 min94%98.8%72,00076,800 (1.60 d)40,864
2. Twin-Tube Co-Extrusion Cap1.2 s45 min90%97.4%72,00086,400 (1.80 d)38,132
3. Automated Heat-Crimped Cut1.2 s35 min84%95.8%48,00096,000 (2.00 d)34,804
4. GC Active Loading Verification1.2 s10 min95%98.5%19,20048,000 (1.00 d)40,939
5. Refrigerated Foil Pouch Box1.2 s15 min96%99.3%24,00057,600 (1.20 d)41,468

Key figures

Takt time
1.1 s
Lead time
9.80 d
Value-added time
6.0 s
Process cycle efficiency (PCE)
0.001%
Rolled throughput yield (RTY)
90.2%
Customer demand per day
48,000 units
Line capacity per day
34,804 units
Bottleneck
Automated Heat-Crimped Cut

Reading the bottleneck

The bottleneck is "Automated Heat-Crimped Cut": it can process 34,804 units per day against a demand of 48,000 units, so it falls short of demand by 27.5%. Once downtime and scrap are counted, its cycle time grows from 1.2 s to 1.5 s, against a takt of 1.1 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Agrochemicals, Fertilizers & Bio-Inputs: Agrochemicals, Fertilizers & Bio-Inputs