Polymer Film & Inoculant Precision Seed Treater

Product family: Fluorescent Treated Hybrid Corn.

Flow: Seed Coating Chemicals Supplier → Rotary Gravimetric Gravity Sep → Precision Atomized Slurry Coat → Fluid-Bed Quick Polymer Dry → Dust-Off Abrasion QC → 80,000-Kernel Count Bagging → Regional Seed Distributors

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Polymer Film & Inoculant Precision Seed TreaterSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Seed Coating Chemicals Supplier → Rotary Gravimetric Gravity Sep (565 s) → Precision Atomized Slurry Coat (706 s) → Fluid-Bed Quick Polymer Dry (881 s) → Dust-Off Abrasion QC (598 s) → 80,000-Kernel Count Bagging (482 s) → Regional Seed Distributors.SUPPLIERSeed CoatingChemicalsSupplierI1.60 d1RotaryGravimetric…C/T 565 sI1.80 d2PrecisionAtomized Slurry…C/T 706 sI2.00 d3Fluid-Bed QuickPolymer DryC/T 881 sI1.00 d4Dust-Off AbrasionQCC/T 598 sI1.20 d580,000-KernelCount BaggingC/T 482 sI2.20 dCUSTOMERRegional SeedDistributors65 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Rotary Gravimetric Gravity Sep565 s30 min94%98.8%98104 (1.60 d)87
2. Precision Atomized Slurry Coat706 s45 min90%97.4%98117 (1.80 d)65
3. Fluid-Bed Quick Polymer Dry881 s35 min84%95.8%65130 (2.00 d)47
4. Dust-Off Abrasion QC598 s10 min95%98.5%2665 (1.00 d)82
5. 80,000-Kernel Count Bagging482 s15 min96%99.3%3378 (1.20 d)103

Key figures

Takt time
831 s
Lead time
9.86 d
Value-added time
3,232 s
Process cycle efficiency (PCE)
0.61%
Rolled throughput yield (RTY)
90.2%
Customer demand per day
65 tonnes
Line capacity per day
47 tonnes
Bottleneck
Fluid-Bed Quick Polymer Dry

Reading the bottleneck

The bottleneck is "Fluid-Bed Quick Polymer Dry": it can process 47 tonnes per day against a demand of 65 tonnes, so it falls short of demand by 27.1%. Once downtime and scrap are counted, its cycle time grows from 881 s to 1,095 s, against a takt of 831 s. The largest loss at this step is equipment downtime (uptime 84%), about 168 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Agrochemicals, Fertilizers & Bio-Inputs: Agrochemicals, Fertilizers & Bio-Inputs