Leonardite Potassium Humate Flake Extraction

Product family: Water-Soluble Soil Activator.

Flow: Oxidized Leonardite Ore → Hammer Crush & KOH Digestion → Filter Press Insoluble Gangue → Drum Flaker Thin Film Dry → Fulvic Acid UV Absorbance QC → 25kg Kraft Valve-Bag Fill → Global Specialty Ag Retail

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Leonardite Potassium Humate Flake ExtractionSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Oxidized Leonardite Ore → Hammer Crush & KOH Digestion (1,311 s) → Filter Press Insoluble Gangue (1,639 s) → Drum Flaker Thin Film Dry (2,044 s) → Fulvic Acid UV Absorbance QC (1,389 s) → 25kg Kraft Valve-Bag Fill (1,119 s) → Global Specialty Ag Retail.SUPPLIEROxidizedLeonardite OreI1.61 d1Hammer Crush &KOH DigestionC/T 1,311 sI1.79 d2Filter PressInsoluble GangueC/T 1,639 sI2.00 d3Drum Flaker ThinFilm DryC/T 2,044 sI1.00 d4Fulvic Acid UVAbsorbance QCC/T 1,389 sI1.21 d525kg KraftValve-Bag FillC/T 1,119 sI2.21 dCUSTOMERGlobalSpecialty Ag…28 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Hammer Crush & KOH Digestion1,311 s30 min94%98.8%4245 (1.61 d)37
2. Filter Press Insoluble Gangue1,639 s45 min90%97.4%4250 (1.79 d)28
3. Drum Flaker Thin Film Dry2,044 s35 min84%95.8%2856 (2.00 d)20
4. Fulvic Acid UV Absorbance QC1,389 s10 min95%98.5%1128 (1.00 d)35
5. 25kg Kraft Valve-Bag Fill1,119 s15 min96%99.3%1434 (1.21 d)44

Key figures

Takt time
1,929 s
Lead time
9.96 d
Value-added time
7,502 s
Process cycle efficiency (PCE)
1.4%
Rolled throughput yield (RTY)
90.2%
Customer demand per day
28 tonnes
Line capacity per day
20 tonnes
Bottleneck
Drum Flaker Thin Film Dry

Reading the bottleneck

The bottleneck is "Drum Flaker Thin Film Dry": it can process 20 tonnes per day against a demand of 28 tonnes, so it falls short of demand by 27.0%. Once downtime and scrap are counted, its cycle time grows from 2,044 s to 2,540 s, against a takt of 1,929 s. The largest loss at this step is equipment downtime (uptime 84%), about 389 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.