Sanitized 70°C Poultry-Manure Organic Pellet

Product family: 4-3-3 Certified Soil Pellets.

Flow: Layer Barn Litter Pools → Turned Aerobic Windrow Compost → Hammer Mill & Ring-Die Press → 70°C Pathogen Hygienize Cool → Crumbles Screening & Dusting → Big-Bag & Silo Tipping Load → Vineyards & Organic Farms

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Sanitized 70°C Poultry-Manure Organic PelletSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Layer Barn Litter Pools → Turned Aerobic Windrow Compost (230 s) → Hammer Mill & Ring-Die Press (287 s) → 70°C Pathogen Hygienize Cool (358 s) → Crumbles Screening & Dusting (243 s) → Big-Bag & Silo Tipping Load (196 s) → Vineyards & Organic Farms.SUPPLIERLayer BarnLitter PoolsI1.60 d1Turned AerobicWindrow CompostC/T 230 sI1.80 d2Hammer Mill &Ring-Die PressC/T 287 sI2.00 d370°C PathogenHygienize CoolC/T 358 sI1.00 d4CrumblesScreening &…C/T 243 sI1.20 d5Big-Bag & SiloTipping LoadC/T 196 sI2.20 dCUSTOMERVineyards &Organic Farms160 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Turned Aerobic Windrow Compost230 s30 min94%98.8%240256 (1.60 d)213
2. Hammer Mill & Ring-Die Press287 s45 min90%97.4%240288 (1.80 d)159
3. 70°C Pathogen Hygienize Cool358 s35 min84%95.8%160320 (2.00 d)117
4. Crumbles Screening & Dusting243 s10 min95%98.5%64160 (1.00 d)202
5. Big-Bag & Silo Tipping Load196 s15 min96%99.3%80192 (1.20 d)254

Key figures

Takt time
338 s
Lead time
9.82 d
Value-added time
1,314 s
Process cycle efficiency (PCE)
0.25%
Rolled throughput yield (RTY)
90.2%
Customer demand per day
160 tonnes
Line capacity per day
117 tonnes
Bottleneck
70°C Pathogen Hygienize Cool

Reading the bottleneck

The bottleneck is "70°C Pathogen Hygienize Cool": it can process 117 tonnes per day against a demand of 160 tonnes, so it falls short of demand by 27.1%. Once downtime and scrap are counted, its cycle time grows from 358 s to 445 s, against a takt of 338 s. The largest loss at this step is equipment downtime (uptime 84%), about 68.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Agrochemicals, Fertilizers & Bio-Inputs: Agrochemicals, Fertilizers & Bio-Inputs