Dual-Cartridge 400mL Structural Anchor Epoxy

Product family: Side-by-Side 1:1 Resins.

Flow: Epoxy & Amine Producer → Dual Vacuum Thixotropy Mix → Clean A/B Piston Cartridge Fill → Ultrasonic Leak & Plunger → Static Nozzle Clip & Sleeve → Tensile Rebar Pull Batch Test → Construction Anchoring Supply

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Dual-Cartridge 400mL Structural Anchor EpoxySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Epoxy & Amine Producer → Dual Vacuum Thixotropy Mix (4.3 s) → Clean A/B Piston Cartridge Fill (5.3 s) → Ultrasonic Leak & Plunger (6.8 s) → Static Nozzle Clip & Sleeve (4.6 s) → Tensile Rebar Pull Batch Test (3.8 s) → Construction Anchoring Supply.SUPPLIEREpoxy & AmineProducerI1.50 d1Dual VacuumThixotropy MixC/T 4.3 sI1.90 d2Clean A/B PistonCartridge FillC/T 5.3 sI2.20 d3Ultrasonic Leak &PlungerC/T 6.8 sI0.90 d4Static NozzleClip & SleeveC/T 4.6 sI1.00 d5Tensile RebarPull Batch TestC/T 3.8 sI1.60 dCUSTOMERConstructionAnchoring…8,500 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Dual Vacuum Thixotropy Mix4.3 s25 min94%98.5%12,75012,750 (1.50 d)11,412
2. Clean A/B Piston Cartridge Fill5.3 s65 min89%97.2%12,75016,150 (1.90 d)8,390
3. Ultrasonic Leak & Plunger6.8 s20 min84%94.5%8,50018,700 (2.20 d)6,164
4. Static Nozzle Clip & Sleeve4.6 s15 min94%98.8%4,2507,650 (0.90 d)10,539
5. Tensile Rebar Pull Batch Test3.8 s25 min93%99.1%4,2508,500 (1.00 d)12,369

Key figures

Takt time
6.4 s
Lead time
9.10 d
Value-added time
24.8 s
Process cycle efficiency (PCE)
0.005%
Rolled throughput yield (RTY)
88.6%
Customer demand per day
8,500 units
Line capacity per day
6,164 units
Bottleneck
Ultrasonic Leak & Plunger

Reading the bottleneck

The bottleneck is "Ultrasonic Leak & Plunger": it can process 6,164 units per day against a demand of 8,500 units, so it falls short of demand by 27.5%. Once downtime and scrap are counted, its cycle time grows from 6.8 s to 8.6 s, against a takt of 6.4 s. The largest loss at this step is equipment downtime (uptime 84%), about 1.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.