92% Metallic Zinc-Rich Anti-Corrosion Primer
Product family: Offshore Wind Tower Primers.
Flow: Ultra-Fine Zinc Dust Supplier → Ground-Free ATEX Powder Charge → Low-Shear High-Density Mix → Grind Gauge & Specific Grav → Heavy-Gauge Drum Vibration → Salt-Spray 3000h Batch Cert → Offshore Steel Fabricators
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Ground-Free ATEX Powder Charge | 115 s | 25 min | 94% | 98.5% | 480 | 480 (1.50 d) | 427 |
| 2. Low-Shear High-Density Mix | 142 s | 65 min | 89% | 97.2% | 480 | 608 (1.90 d) | 313 |
| 3. Grind Gauge & Specific Grav | 181 s | 20 min | 84% | 94.5% | 320 | 704 (2.20 d) | 232 |
| 4. Heavy-Gauge Drum Vibration | 122 s | 15 min | 94% | 98.8% | 160 | 288 (0.90 d) | 397 |
| 5. Salt-Spray 3000h Batch Cert | 101 s | 25 min | 93% | 99.1% | 160 | 320 (1.00 d) | 465 |
Key figures
- Takt time
- 169 s
- Lead time
- 9.11 d
- Value-added time
- 661 s
- Process cycle efficiency (PCE)
- 0.13%
- Rolled throughput yield (RTY)
- 88.6%
- Customer demand per day
- 320 packs
- Line capacity per day
- 232 packs
- Bottleneck
- Grind Gauge & Specific Grav
Reading the bottleneck
The bottleneck is "Grind Gauge & Specific Grav": it can process 232 packs per day against a demand of 320 packs, so it falls short of demand by 27.6%. Once downtime and scrap are counted, its cycle time grows from 181 s to 228 s, against a takt of 169 s. The largest loss at this step is equipment downtime (uptime 84%), about 34.5 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Paints, Coatings & Batch Chemicals: Paints, Coatings & Batch Chemicals
- Specialty Coatings Batch Mixing & Fill
- Low-VOC Waterborne Matte Emulsion Wall Paint
- Metallic Waterborne OEM Automotive Basecoat
- Architectural Super-Durable Polyester Powder
- Silicone Foul-Release Copper-Free Marine Hull
- 100%-Solids UV-Curable Parquet Wood Finish
- Food-Safe Low-Migration UV Flexo Ink Mill
- Dual-Cartridge 400mL Structural Anchor Epoxy
- High-Build Glass-Bead Reflective Road Paint
- Precision Color-Matched Touch-Up Aerosol Can
- 1450°C Smelted Porcelain Tile Frit & Glaze