100%-Solids UV-Curable Parquet Wood Finish
Product family: Zero-VOC Roll-Coat Lacquers.
Flow: Acrylate Monomer Producer → Dark Yellow-Light Reactor Mix → Ceramic Bead Mill Dispersal → FTIR Reactivity Cure Check → UV-Opaque Black Jerrycan Fill → Rotary Abrasion Lot Release → Flooring & Door Factories
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Dark Yellow-Light Reactor Mix | 102 s | 25 min | 94% | 98.5% | 540 | 540 (1.50 d) | 481 |
| 2. Ceramic Bead Mill Dispersal | 126 s | 65 min | 89% | 97.2% | 540 | 684 (1.90 d) | 353 |
| 3. FTIR Reactivity Cure Check | 161 s | 20 min | 84% | 94.5% | 360 | 792 (2.20 d) | 260 |
| 4. UV-Opaque Black Jerrycan Fill | 108 s | 15 min | 94% | 98.8% | 180 | 324 (0.90 d) | 449 |
| 5. Rotary Abrasion Lot Release | 90.0 s | 25 min | 93% | 99.1% | 180 | 360 (1.00 d) | 522 |
Key figures
- Takt time
- 150 s
- Lead time
- 9.11 d
- Value-added time
- 587 s
- Process cycle efficiency (PCE)
- 0.12%
- Rolled throughput yield (RTY)
- 88.6%
- Customer demand per day
- 360 packs
- Line capacity per day
- 260 packs
- Bottleneck
- FTIR Reactivity Cure Check
Reading the bottleneck
The bottleneck is "FTIR Reactivity Cure Check": it can process 260 packs per day against a demand of 360 packs, so it falls short of demand by 27.7%. Once downtime and scrap are counted, its cycle time grows from 161 s to 203 s, against a takt of 150 s. The largest loss at this step is equipment downtime (uptime 84%), about 30.7 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Paints, Coatings & Batch Chemicals: Paints, Coatings & Batch Chemicals
- Specialty Coatings Batch Mixing & Fill
- Low-VOC Waterborne Matte Emulsion Wall Paint
- Metallic Waterborne OEM Automotive Basecoat
- Architectural Super-Durable Polyester Powder
- Silicone Foul-Release Copper-Free Marine Hull
- Food-Safe Low-Migration UV Flexo Ink Mill
- Dual-Cartridge 400mL Structural Anchor Epoxy