Metallic Waterborne OEM Automotive Basecoat

Product family: 50nm Flake Effect Metallic.

Flow: Aluminum Effect Flake Supplier → Pearlescent Gentle Slurry Wet → Multi-Angle Spectrophotometer → 2um Bag & Cartridge Polish → Stainless Returnable Tote Fill → Atomizer Spray Panel Cert → OEM Body Paint Circulators

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Metallic Waterborne OEM Automotive BasecoatSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Aluminum Effect Flake Supplier → Pearlescent Gentle Slurry Wet (87.0 s) → Multi-Angle Spectrophotometer (108 s) → 2um Bag & Cartridge Polish (138 s) → Stainless Returnable Tote Fill (93.0 s) → Atomizer Spray Panel Cert (77.0 s) → OEM Body Paint Circulators.SUPPLIERAluminum EffectFlake SupplierI1.50 d1PearlescentGentle Slurry WetC/T 87.0 sI1.90 d2Multi-AngleSpectrophotometerC/T 108 sI2.20 d32um Bag &Cartridge PolishC/T 138 sI0.90 d4StainlessReturnable Tote…C/T 93.0 sI1.00 d5Atomizer SprayPanel CertC/T 77.0 sI1.60 dCUSTOMEROEM Body PaintCirculators420 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Pearlescent Gentle Slurry Wet87.0 s25 min94%98.5%630630 (1.50 d)564
2. Multi-Angle Spectrophotometer108 s65 min89%97.2%630798 (1.90 d)412
3. 2um Bag & Cartridge Polish138 s20 min84%94.5%420924 (2.20 d)304
4. Stainless Returnable Tote Fill93.0 s15 min94%98.8%210378 (0.90 d)521
5. Atomizer Spray Panel Cert77.0 s25 min93%99.1%210420 (1.00 d)610

Key figures

Takt time
129 s
Lead time
9.11 d
Value-added time
503 s
Process cycle efficiency (PCE)
0.10%
Rolled throughput yield (RTY)
88.6%
Customer demand per day
420 batches
Line capacity per day
304 batches
Bottleneck
2um Bag & Cartridge Polish

Reading the bottleneck

The bottleneck is "2um Bag & Cartridge Polish": it can process 304 batches per day against a demand of 420 batches, so it falls short of demand by 27.7%. Once downtime and scrap are counted, its cycle time grows from 138 s to 174 s, against a takt of 129 s. The largest loss at this step is equipment downtime (uptime 84%), about 26.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.