1450°C Smelted Porcelain Tile Frit & Glaze

Product family: Digital Ceramic Inkjet Glazes.

Flow: Quartz, Zircon & Borates → Raw Oxide Dry Proportion → Rotary Continuous Frit Furnace → Water Quench Granulate Frit → Alumina Ball-Mill Micron Wet → Sub-Micron Ceramic Ink Sieve → Ceramic Tile Factories

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 1450°C Smelted Porcelain Tile Frit & GlazeSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Quartz, Zircon & Borates → Raw Oxide Dry Proportion (580 s) → Rotary Continuous Frit Furnace (716 s) → Water Quench Granulate Frit (912 s) → Alumina Ball-Mill Micron Wet (614 s) → Sub-Micron Ceramic Ink Sieve (512 s) → Ceramic Tile Factories.SUPPLIERQuartz, Zircon& BoratesI1.51 d1Raw Oxide DryProportionC/T 580 sI1.91 d2Rotary ContinuousFrit FurnaceC/T 716 sI2.20 d3Water QuenchGranulate FritC/T 912 sI0.91 d4Alumina Ball-MillMicron WetC/T 614 sI1.00 d5Sub-MicronCeramic Ink SieveC/T 512 sI1.60 dCUSTOMERCeramic TileFactories95 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Raw Oxide Dry Proportion580 s25 min94%98.5%143143 (1.51 d)128
2. Rotary Continuous Frit Furnace716 s65 min89%97.2%143181 (1.91 d)95
3. Water Quench Granulate Frit912 s20 min84%94.5%95209 (2.20 d)69
4. Alumina Ball-Mill Micron Wet614 s15 min94%98.8%4886 (0.91 d)120
5. Sub-Micron Ceramic Ink Sieve512 s25 min93%99.1%4895 (1.00 d)140

Key figures

Takt time
853 s
Lead time
9.16 d
Value-added time
3,334 s
Process cycle efficiency (PCE)
0.45%
Rolled throughput yield (RTY)
88.6%
Customer demand per day
95 tonnes
Line capacity per day
69 tonnes
Bottleneck
Water Quench Granulate Frit

Reading the bottleneck

The bottleneck is "Water Quench Granulate Frit": it can process 69 tonnes per day against a demand of 95 tonnes, so it falls short of demand by 26.9%. Once downtime and scrap are counted, its cycle time grows from 912 s to 1,149 s, against a takt of 853 s. The largest loss at this step is equipment downtime (uptime 84%), about 174 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.