Food-Safe Low-Migration UV Flexo Ink Mill

Product family: Spot & CMYK Process Inks.

Flow: Organic Pigment Producer → Tri-Roll Hydraulic Pre-Mill → Horizontal Bead Mill <2um → GC-MS Migration Purity Check → Automated Ink Dispenser Fill → Spectro Drawdown Delta-E → Food & Pharma Label Printers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Food-Safe Low-Migration UV Flexo Ink MillSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Organic Pigment Producer → Tri-Roll Hydraulic Pre-Mill (82.0 s) → Horizontal Bead Mill <2um (101 s) → GC-MS Migration Purity Check (128 s) → Automated Ink Dispenser Fill (86.0 s) → Spectro Drawdown Delta-E (72.0 s) → Food & Pharma Label Printers.SUPPLIEROrganic PigmentProducerI1.50 d1Tri-RollHydraulic…C/T 82.0 sI1.90 d2Horizontal BeadMill <2umC/T 101 sI2.20 d3GC-MS MigrationPurity CheckC/T 128 sI0.90 d4Automated InkDispenser FillC/T 86.0 sI1.00 d5Spectro DrawdownDelta-EC/T 72.0 sI1.60 dCUSTOMERFood & PharmaLabel Printers450 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Tri-Roll Hydraulic Pre-Mill82.0 s25 min94%98.5%675675 (1.50 d)598
2. Horizontal Bead Mill <2um101 s65 min89%97.2%675855 (1.90 d)440
3. GC-MS Migration Purity Check128 s20 min84%94.5%450990 (2.20 d)327
4. Automated Ink Dispenser Fill86.0 s15 min94%98.8%225405 (0.90 d)564
5. Spectro Drawdown Delta-E72.0 s25 min93%99.1%225450 (1.00 d)653

Key figures

Takt time
120 s
Lead time
9.11 d
Value-added time
469 s
Process cycle efficiency (PCE)
0.095%
Rolled throughput yield (RTY)
88.6%
Customer demand per day
450 packs
Line capacity per day
327 packs
Bottleneck
GC-MS Migration Purity Check

Reading the bottleneck

The bottleneck is "GC-MS Migration Purity Check": it can process 327 packs per day against a demand of 450 packs, so it falls short of demand by 27.2%. Once downtime and scrap are counted, its cycle time grows from 128 s to 161 s, against a takt of 120 s. The largest loss at this step is equipment downtime (uptime 84%), about 24.4 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Paints, Coatings & Batch Chemicals: Paints, Coatings & Batch Chemicals