Inverse Emulsion Polyacrylamide Flocculant
Product family: Wastewater Dewatering Polymer.
Flow: Acrylamide Monomer Producer → Nitrogen Purge Adiabatic React → Inverse-Emulsion Stabilize → Residual Monomer <200ppm → Active Inversion Polymer Test → IBC & Stainless Tanker Load → Municipal & Mining Water
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Nitrogen Purge Adiabatic React | 1,440 s | 20 min | 95% | 99.1% | 54 | 50 (1.39 d) | 52 |
| 2. Inverse-Emulsion Stabilize | 1,890 s | 45 min | 91% | 98.2% | 43 | 58 (1.61 d) | 37 |
| 3. Residual Monomer <200ppm | 2,385 s | 18 min | 85% | 95.8% | 36 | 72 (2.00 d) | 27 |
| 4. Active Inversion Polymer Test | 1,755 s | 30 min | 92% | 98.4% | 22 | 40 (1.11 d) | 40 |
| 5. IBC & Stainless Tanker Load | 1,260 s | 10 min | 97% | 99.5% | 14 | 32 (0.89 d) | 61 |
Key figures
- Takt time
- 2,250 s
- Lead time
- 8.61 d
- Value-added time
- 8,730 s
- Process cycle efficiency (PCE)
- 1.3%
- Rolled throughput yield (RTY)
- 91.3%
- Customer demand per day
- 36 tonnes
- Line capacity per day
- 27 tonnes
- Bottleneck
- Residual Monomer <200ppm
Reading the bottleneck
The bottleneck is "Residual Monomer <200ppm": it can process 27 tonnes per day against a demand of 36 tonnes, so it falls short of demand by 24.2%. Once downtime and scrap are counted, its cycle time grows from 2,385 s to 2,929 s, against a takt of 2,250 s. The largest loss at this step is equipment downtime (uptime 85%), about 421 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Lubricants, Adhesives & Petrochem: Lubricants, Adhesives & Petrochem
- 0W-20 Full-Synthetic Motor Oil Blending & Pack
- Long-Life OAT EV Thermal Coolant Tote Line
- ISO 22241 Ultra-Pure AdBlue / DEF Tote Line
- Neutral-Cure Oxime Silicone Sealant Cartridge
- Falling-Film SO3 Sulfonation SLES Surfactant
- Metallocene EVA/PO Hot-Melt Packaging Pellets
- Complex Lithium NLGI-2 Bearing Grease Kettle
- NAS-6 Ultra-Clean Zinc-Free Hydraulic Fluid
- SAE Type-IV Aircraft Wing Anti-Icing Fluid
- EFSA Food-Contact Bottle-to-Bottle rPET Pellet
- Hydrophilic Amino-Silicone Textile Softener