Metallocene EVA/PO Hot-Melt Packaging Pellets

Product family: 20kg Non-Stick Chicklets.

Flow: Metallocene Polyolefin & Tackifier → Nitrogen-Blanket Twin Knead → Lab Ring-Ball Softening Check → Underwater Strand Pelletizer → Fluidized Cooler & Vibrator → 20kg Kraft Bag & Pallet Stretch → Beverage & Carton Packers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Metallocene EVA/PO Hot-Melt Packaging PelletsSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Metallocene Polyolefin & Tackifier → Nitrogen-Blanket Twin Knead (1,234 s) → Lab Ring-Ball Softening Check (1,620 s) → Underwater Strand Pelletizer (2,044 s) → Fluidized Cooler & Vibrator (1,504 s) → 20kg Kraft Bag & Pallet Stretch (1,080 s) → Beverage & Carton Packers.SUPPLIERMetallocenePolyolefin &TackifierI1.40 d1Nitrogen-BlanketTwin KneadC/T 1,234 sI1.60 d2Lab Ring-BallSoftening CheckC/T 1,620 sI2.00 d3Underwater StrandPelletizerC/T 2,044 sI1.10 d4Fluidized Cooler& VibratorC/T 1,504 sI0.90 d520kg Kraft Bag &Pallet StretchC/T 1,080 sI1.50 dCUSTOMERBeverage &Carton Packers42 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Nitrogen-Blanket Twin Knead1,234 s20 min95%99.1%6359 (1.40 d)61
2. Lab Ring-Ball Softening Check1,620 s45 min91%98.2%5067 (1.60 d)43
3. Underwater Strand Pelletizer2,044 s18 min85%95.8%4284 (2.00 d)32
4. Fluidized Cooler & Vibrator1,504 s30 min92%98.4%2546 (1.10 d)47
5. 20kg Kraft Bag & Pallet Stretch1,080 s10 min97%99.5%1738 (0.90 d)71

Key figures

Takt time
1,929 s
Lead time
8.59 d
Value-added time
7,482 s
Process cycle efficiency (PCE)
1.1%
Rolled throughput yield (RTY)
91.3%
Customer demand per day
42 tonnes
Line capacity per day
32 tonnes
Bottleneck
Underwater Strand Pelletizer

Reading the bottleneck

The bottleneck is "Underwater Strand Pelletizer": it can process 32 tonnes per day against a demand of 42 tonnes, so it falls short of demand by 24.2%. Once downtime and scrap are counted, its cycle time grows from 2,044 s to 2,510 s, against a takt of 1,929 s. The largest loss at this step is equipment downtime (uptime 85%), about 361 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Lubricants, Adhesives & Petrochem: Lubricants, Adhesives & Petrochem