Hydrophilic Amino-Silicone Textile Softener
Product family: Micro-Emulsion Drum Batches.
Flow: Siloxane Cyclic Oligomers → Catalytic Siloxane Ring-Open → Non-Ionic Micro-Emulsification → Zeta Potential Stability Check → 5um Polish & Drum Fill → Padding Trial Shade Audit → Denim & Dyeing Mills
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Catalytic Siloxane Ring-Open | 1,234 s | 20 min | 95% | 99.1% | 42 | 39 (1.39 d) | 41 |
| 2. Non-Ionic Micro-Emulsification | 1,620 s | 45 min | 91% | 98.2% | 34 | 45 (1.61 d) | 29 |
| 3. Zeta Potential Stability Check | 2,044 s | 18 min | 85% | 95.8% | 28 | 56 (2.00 d) | 21 |
| 4. 5um Polish & Drum Fill | 1,504 s | 30 min | 92% | 98.4% | 17 | 31 (1.11 d) | 31 |
| 5. Padding Trial Shade Audit | 1,080 s | 10 min | 97% | 99.5% | 11 | 25 (0.89 d) | 47 |
Key figures
- Takt time
- 1,929 s
- Lead time
- 8.64 d
- Value-added time
- 7,482 s
- Process cycle efficiency (PCE)
- 1.6%
- Rolled throughput yield (RTY)
- 91.3%
- Customer demand per day
- 28 tonnes
- Line capacity per day
- 21 tonnes
- Bottleneck
- Zeta Potential Stability Check
Reading the bottleneck
The bottleneck is "Zeta Potential Stability Check": it can process 21 tonnes per day against a demand of 28 tonnes, so it falls short of demand by 24.7%. Once downtime and scrap are counted, its cycle time grows from 2,044 s to 2,510 s, against a takt of 1,929 s. The largest loss at this step is equipment downtime (uptime 85%), about 361 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Lubricants, Adhesives & Petrochem: Lubricants, Adhesives & Petrochem
- 0W-20 Full-Synthetic Motor Oil Blending & Pack
- Long-Life OAT EV Thermal Coolant Tote Line
- ISO 22241 Ultra-Pure AdBlue / DEF Tote Line
- Neutral-Cure Oxime Silicone Sealant Cartridge
- Falling-Film SO3 Sulfonation SLES Surfactant
- Metallocene EVA/PO Hot-Melt Packaging Pellets
- Complex Lithium NLGI-2 Bearing Grease Kettle
- NAS-6 Ultra-Clean Zinc-Free Hydraulic Fluid
- SAE Type-IV Aircraft Wing Anti-Icing Fluid
- Inverse Emulsion Polyacrylamide Flocculant
- EFSA Food-Contact Bottle-to-Bottle rPET Pellet