0W-20 Full-Synthetic Motor Oil Blending & Pack

Product family: 1L & 5L API-SP Retail Jugs.

Flow: PAO & Ester Base Pipelines → Simultaneous Metered Blending → Heated Additive Manifold Mix → Kinematic Viscosity & CCS QC → Rotary Blow-Fill 1L/5L Bottles → Foil Induction & Case Pallet → Auto Dealerships & Retail

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 0W-20 Full-Synthetic Motor Oil Blending & PackSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. PAO & Ester Base Pipelines → Simultaneous Metered Blending (1.9 s) → Heated Additive Manifold Mix (2.4 s) → Kinematic Viscosity & CCS QC (3.1 s) → Rotary Blow-Fill 1L/5L Bottles (2.3 s) → Foil Induction & Case Pallet (1.6 s) → Auto Dealerships & Retail.SUPPLIERPAO & EsterBase PipelinesI1.40 d1SimultaneousMetered BlendingC/T 1.9 sI1.60 d2Heated AdditiveManifold MixC/T 2.4 sI2.00 d3KinematicViscosity & CCS…C/T 3.1 sI1.10 d4Rotary Blow-Fill1L/5L BottlesC/T 2.3 sI0.90 d5Foil Induction &Case PalletC/T 1.6 sI1.50 dCUSTOMERAutoDealerships &…28,000 / liters

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Simultaneous Metered Blending1.9 s20 min95%99.1%42,00039,200 (1.40 d)39,739
2. Heated Additive Manifold Mix2.4 s45 min91%98.2%33,60044,800 (1.60 d)29,322
3. Kinematic Viscosity & CCS QC3.1 s18 min85%95.8%28,00056,000 (2.00 d)20,993
4. Rotary Blow-Fill 1L/5L Bottles2.3 s30 min92%98.4%16,80030,800 (1.10 d)30,701
5. Foil Induction & Case Pallet1.6 s10 min97%99.5%11,20025,200 (0.90 d)47,956

Key figures

Takt time
2.9 s
Lead time
8.50 d
Value-added time
11.3 s
Process cycle efficiency (PCE)
0.002%
Rolled throughput yield (RTY)
91.3%
Customer demand per day
28,000 liters
Line capacity per day
20,993 liters
Bottleneck
Kinematic Viscosity & CCS QC

Reading the bottleneck

The bottleneck is "Kinematic Viscosity & CCS QC": it can process 20,993 liters per day against a demand of 28,000 liters, so it falls short of demand by 25.0%. Once downtime and scrap are counted, its cycle time grows from 3.1 s to 3.8 s, against a takt of 2.9 s. The largest loss at this step is equipment downtime (uptime 85%), about 0.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.