Complex Lithium NLGI-2 Bearing Grease Kettle
Product family: 400g Pull-Tab Grease Carts.
Flow: 12-HSA & LiOH Monohydrate → Pressurized Saponification → Flash Vacuum Cooling Mix → High-Press Homogenizer → Penetration & Drop-Point Lab → Automated 400g Cart & Cap → Mining & Bearing Distributors
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Pressurized Saponification | 2.5 s | 20 min | 95% | 99.1% | 21,000 | 19,600 (1.40 d) | 20,034 |
| 2. Flash Vacuum Cooling Mix | 3.2 s | 45 min | 91% | 98.2% | 16,800 | 22,400 (1.60 d) | 14,452 |
| 3. High-Press Homogenizer | 4.1 s | 18 min | 85% | 95.8% | 14,000 | 28,000 (2.00 d) | 10,510 |
| 4. Penetration & Drop-Point Lab | 3.0 s | 30 min | 92% | 98.4% | 8,400 | 15,400 (1.10 d) | 15,390 |
| 5. Automated 400g Cart & Cap | 2.2 s | 10 min | 97% | 99.5% | 5,600 | 12,600 (0.90 d) | 23,032 |
Key figures
- Takt time
- 3.9 s
- Lead time
- 8.50 d
- Value-added time
- 15.0 s
- Process cycle efficiency (PCE)
- 0.003%
- Rolled throughput yield (RTY)
- 91.3%
- Customer demand per day
- 14,000 units
- Line capacity per day
- 10,510 units
- Bottleneck
- High-Press Homogenizer
Reading the bottleneck
The bottleneck is "High-Press Homogenizer": it can process 10,510 units per day against a demand of 14,000 units, so it falls short of demand by 24.9%. Once downtime and scrap are counted, its cycle time grows from 4.1 s to 5.0 s, against a takt of 3.9 s. The largest loss at this step is equipment downtime (uptime 85%), about 0.7 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Lubricants, Adhesives & Petrochem: Lubricants, Adhesives & Petrochem
- 0W-20 Full-Synthetic Motor Oil Blending & Pack
- Long-Life OAT EV Thermal Coolant Tote Line
- ISO 22241 Ultra-Pure AdBlue / DEF Tote Line
- Neutral-Cure Oxime Silicone Sealant Cartridge
- Falling-Film SO3 Sulfonation SLES Surfactant
- Metallocene EVA/PO Hot-Melt Packaging Pellets
- NAS-6 Ultra-Clean Zinc-Free Hydraulic Fluid
- SAE Type-IV Aircraft Wing Anti-Icing Fluid
- Inverse Emulsion Polyacrylamide Flocculant
- EFSA Food-Contact Bottle-to-Bottle rPET Pellet
- Hydrophilic Amino-Silicone Textile Softener