Smart Building BACnet / KNX HVAC Commissioning
Product family: Zero-Fault Digital Twin Cx.
Flow: Building Automation Controllers → Edge IP Controller Field Mount → DALI Lighting & Damper Loop → Point-to-Point Graphics Check → Automated Functional Seq Test → Air Balancing & LEED Handover → Net-Zero Green Offices
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Edge IP Controller Field Mount | 598 s | 10 min | 96% | 98.4% | 11 | 28 (1.00 d) | 40 |
| 2. DALI Lighting & Damper Loop | 752 s | 12 min | 93% | 97.6% | 8 | 36 (1.29 d) | 30 |
| 3. Point-to-Point Graphics Check | 1,032 s | 20 min | 85% | 93.8% | 8 | 50 (1.79 d) | 18 |
| 4. Automated Functional Seq Test | 714 s | 8 min | 95% | 97.4% | 6 | 25 (0.89 d) | 32 |
| 5. Air Balancing & LEED Handover | 501 s | 5 min | 97% | 98.8% | 4 | 14 (0.50 d) | 48 |
Key figures
- Takt time
- 964 s
- Lead time
- 6.20 d
- Value-added time
- 3,597 s
- Process cycle efficiency (PCE)
- 2.1%
- Rolled throughput yield (RTY)
- 86.7%
- Customer demand per day
- 28 rooms
- Line capacity per day
- 18 rooms
- Bottleneck
- Point-to-Point Graphics Check
Reading the bottleneck
The bottleneck is "Point-to-Point Graphics Check": it can process 18 rooms per day against a demand of 28 rooms, so it falls short of demand by 37.1%. Once downtime and scrap are counted, its cycle time grows from 1,032 s to 1,294 s, against a takt of 964 s. The largest loss at this step is equipment downtime (uptime 85%), about 182 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Commercial Building MEP & Fit-Out Trades: Commercial Building MEP & Fit-Out Trades
- Grade-A Office Tower Floor MEP First-Fix Takt
- High-Rise Acoustic Double-Board Drywall Train
- Bio-Pharma Cleanroom Stainless Exhaust Ducting
- Warehouse ESFR High-Hazard Fire Sprinkler Grid
- Food & Pharma Seamless Polyurethane Screed Floor
- 10m/s Gearless High-Rise Elevator Shaft Install
- 500kW Commercial Flat-Roof Ballasted Solar Fit
- Industrial Refinery Turnaround Scaffold Build
- Multi-Tier Heavy Warehouse Steel Mezzanine
- Frameless Acoustic Office Glass Partitioning
- 70-Meter Internal Climbing Tower Crane Erection