Multi-Tier Heavy Warehouse Steel Mezzanine

Product family: 3-Level Pick Tower Erection.

Flow: Cold-Rolled Sigma Profiles → Floor Slab Bolt Anchor Drill → Column & Main Beam Torque → Purlin Grid & Decking Screw → Staircase, Handrail & Pallet → Load Sign-Off & Sprinkler Clear → E-Commerce 3PL Hubs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Multi-Tier Heavy Warehouse Steel MezzanineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Cold-Rolled Sigma Profiles → Floor Slab Bolt Anchor Drill (1,196 s) → Column & Main Beam Torque (1,504 s) → Purlin Grid & Decking Screw (2,064 s) → Staircase, Handrail & Pallet (1,427 s) → Load Sign-Off & Sprinkler Clear (1,003 s) → E-Commerce 3PL Hubs.SUPPLIERCold-RolledSigma ProfilesI1.00 d1Floor Slab BoltAnchor DrillC/T 1,196 sI1.29 d2Column & MainBeam TorqueC/T 1,504 sI1.79 d3Purlin Grid &Decking ScrewC/T 2,064 sI0.93 d4Staircase,Handrail & PalletC/T 1,427 sI0.50 d5Load Sign-Off &Sprinkler ClearC/T 1,003 sI0.57 dCUSTOMERE-Commerce 3PLHubs14 / rooms

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Floor Slab Bolt Anchor Drill1,196 s10 min96%98.4%614 (1.00 d)20
2. Column & Main Beam Torque1,504 s12 min93%97.6%418 (1.29 d)15
3. Purlin Grid & Decking Screw2,064 s20 min85%93.8%425 (1.79 d)9
4. Staircase, Handrail & Pallet1,427 s8 min95%97.4%313 (0.93 d)16
5. Load Sign-Off & Sprinkler Clear1,003 s5 min97%98.8%27 (0.50 d)24

Key figures

Takt time
1,929 s
Lead time
6.34 d
Value-added time
7,194 s
Process cycle efficiency (PCE)
4.2%
Rolled throughput yield (RTY)
86.7%
Customer demand per day
14 rooms
Line capacity per day
9 rooms
Bottleneck
Purlin Grid & Decking Screw

Reading the bottleneck

The bottleneck is "Purlin Grid & Decking Screw": it can process 9 rooms per day against a demand of 14 rooms, so it falls short of demand by 37.1%. Once downtime and scrap are counted, its cycle time grows from 2,064 s to 2,589 s, against a takt of 1,929 s. The largest loss at this step is equipment downtime (uptime 85%), about 364 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.