70-Meter Internal Climbing Tower Crane Erection
Product family: Weekend Road-Closure Rigging.
Flow: Tower Crane Mast & Ballast Yard → Street Permit & Mobile Assist → Foundation Anchor & Mast Stack → Slewing Ring, Cab & Jib Pin → Counterweight Ballast & Reeving → 110% Load Limiter Statutory → Urban High-Rise Contractors
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Street Permit & Mobile Assist | 8,370 s | 10 min | 96% | 98.4% | 1 | 2 (1.00 d) | 3 |
| 2. Foundation Anchor & Mast Stack | 10,530 s | 12 min | 93% | 97.6% | 1 | 3 (1.50 d) | 2 |
| 3. Slewing Ring, Cab & Jib Pin | 14,445 s | 20 min | 85% | 93.8% | 1 | 4 (2.00 d) | 1 |
| 4. Counterweight Ballast & Reeving | 9,990 s | 8 min | 95% | 97.4% | 1 | 2 (1.00 d) | 2 |
| 5. 110% Load Limiter Statutory | 7,020 s | 5 min | 97% | 98.8% | 1 | 1 (0.50 d) | 4 |
Key figures
- Takt time
- 13,500 s
- Lead time
- 8.37 d
- Value-added time
- 50,355 s
- Process cycle efficiency (PCE)
- 22.3%
- Rolled throughput yield (RTY)
- 86.7%
- Customer demand per day
- 2 units
- Line capacity per day
- 1 units
- Bottleneck
- Slewing Ring, Cab & Jib Pin
Reading the bottleneck
The bottleneck is "Slewing Ring, Cab & Jib Pin": it can process 1 units per day against a demand of 2 units, so it falls short of demand by 28.8%. Once downtime and scrap are counted, its cycle time grows from 14,445 s to 18,117 s, against a takt of 13,500 s. The largest loss at this step is equipment downtime (uptime 85%), about 2,549 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Commercial Building MEP & Fit-Out Trades: Commercial Building MEP & Fit-Out Trades
- Grade-A Office Tower Floor MEP First-Fix Takt
- High-Rise Acoustic Double-Board Drywall Train
- Bio-Pharma Cleanroom Stainless Exhaust Ducting
- Warehouse ESFR High-Hazard Fire Sprinkler Grid
- Food & Pharma Seamless Polyurethane Screed Floor
- 10m/s Gearless High-Rise Elevator Shaft Install
- Smart Building BACnet / KNX HVAC Commissioning
- 500kW Commercial Flat-Roof Ballasted Solar Fit
- Industrial Refinery Turnaround Scaffold Build
- Multi-Tier Heavy Warehouse Steel Mezzanine
- Frameless Acoustic Office Glass Partitioning