70-Meter Internal Climbing Tower Crane Erection

Product family: Weekend Road-Closure Rigging.

Flow: Tower Crane Mast & Ballast Yard → Street Permit & Mobile Assist → Foundation Anchor & Mast Stack → Slewing Ring, Cab & Jib Pin → Counterweight Ballast & Reeving → 110% Load Limiter Statutory → Urban High-Rise Contractors

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 70-Meter Internal Climbing Tower Crane ErectionSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Tower Crane Mast & Ballast Yard → Street Permit & Mobile Assist (8,370 s) → Foundation Anchor & Mast Stack (10,530 s) → Slewing Ring, Cab & Jib Pin (14,445 s) → Counterweight Ballast & Reeving (9,990 s) → 110% Load Limiter Statutory (7,020 s) → Urban High-Rise Contractors.SUPPLIERTower CraneMast & BallastYardI1.00 d1Street Permit &Mobile AssistC/T 8,370 sI1.50 d2Foundation Anchor& Mast StackC/T 10,530 sI2.00 d3Slewing Ring, Cab& Jib PinC/T 14,445 sI1.00 d4CounterweightBallast & ReevingC/T 9,990 sI0.50 d5110% Load LimiterStatutoryC/T 7,020 sI0.50 dCUSTOMERUrban High-RiseContractors2 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Street Permit & Mobile Assist8,370 s10 min96%98.4%12 (1.00 d)3
2. Foundation Anchor & Mast Stack10,530 s12 min93%97.6%13 (1.50 d)2
3. Slewing Ring, Cab & Jib Pin14,445 s20 min85%93.8%14 (2.00 d)1
4. Counterweight Ballast & Reeving9,990 s8 min95%97.4%12 (1.00 d)2
5. 110% Load Limiter Statutory7,020 s5 min97%98.8%11 (0.50 d)4

Key figures

Takt time
13,500 s
Lead time
8.37 d
Value-added time
50,355 s
Process cycle efficiency (PCE)
22.3%
Rolled throughput yield (RTY)
86.7%
Customer demand per day
2 units
Line capacity per day
1 units
Bottleneck
Slewing Ring, Cab & Jib Pin

Reading the bottleneck

The bottleneck is "Slewing Ring, Cab & Jib Pin": it can process 1 units per day against a demand of 2 units, so it falls short of demand by 28.8%. Once downtime and scrap are counted, its cycle time grows from 14,445 s to 18,117 s, against a takt of 13,500 s. The largest loss at this step is equipment downtime (uptime 85%), about 2,549 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.