Warehouse ESFR High-Hazard Fire Sprinkler Grid

Product family: Pre-Grooved Coupling Loops.

Flow: Grooved Sch40 Pipe & ESFR Heads → Roof Joist Clamps & Mainline → Pre-Cut Branch Line Hoist → K25 ESFR Head & Drop Torque → 14-Bar 2-Hr Hydrostatic Test → NFPA Flow & Pump Commission → Mega Logistics Fulfill Hubs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Warehouse ESFR High-Hazard Fire Sprinkler GridSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Grooved Sch40 Pipe & ESFR Heads → Roof Joist Clamps & Mainline (523 s) → Pre-Cut Branch Line Hoist (658 s) → K25 ESFR Head & Drop Torque (903 s) → 14-Bar 2-Hr Hydrostatic Test (624 s) → NFPA Flow & Pump Commission (439 s) → Mega Logistics Fulfill Hubs.SUPPLIERGrooved Sch40Pipe & ESFRHeadsI1.00 d1Roof Joist Clamps& MainlineC/T 523 sI1.31 d2Pre-Cut BranchLine HoistC/T 658 sI1.81 d3K25 ESFR Head &Drop TorqueC/T 903 sI0.91 d414-Bar 2-HrHydrostatic TestC/T 624 sI0.50 d5NFPA Flow & PumpCommissionC/T 439 sI0.59 dCUSTOMERMega LogisticsFulfill Hubs32 / rooms

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Roof Joist Clamps & Mainline523 s10 min96%98.4%1332 (1.00 d)46
2. Pre-Cut Branch Line Hoist658 s12 min93%97.6%1042 (1.31 d)34
3. K25 ESFR Head & Drop Torque903 s20 min85%93.8%1058 (1.81 d)20
4. 14-Bar 2-Hr Hydrostatic Test624 s8 min95%97.4%629 (0.91 d)36
5. NFPA Flow & Pump Commission439 s5 min97%98.8%516 (0.50 d)55

Key figures

Takt time
844 s
Lead time
6.24 d
Value-added time
3,147 s
Process cycle efficiency (PCE)
1.9%
Rolled throughput yield (RTY)
86.7%
Customer demand per day
32 rooms
Line capacity per day
20 rooms
Bottleneck
K25 ESFR Head & Drop Torque

Reading the bottleneck

The bottleneck is "K25 ESFR Head & Drop Torque": it can process 20 rooms per day against a demand of 32 rooms, so it falls short of demand by 36.1%. Once downtime and scrap are counted, its cycle time grows from 903 s to 1,133 s, against a takt of 844 s. The largest loss at this step is equipment downtime (uptime 85%), about 159 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.