Warehouse ESFR High-Hazard Fire Sprinkler Grid
Product family: Pre-Grooved Coupling Loops.
Flow: Grooved Sch40 Pipe & ESFR Heads → Roof Joist Clamps & Mainline → Pre-Cut Branch Line Hoist → K25 ESFR Head & Drop Torque → 14-Bar 2-Hr Hydrostatic Test → NFPA Flow & Pump Commission → Mega Logistics Fulfill Hubs
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Roof Joist Clamps & Mainline | 523 s | 10 min | 96% | 98.4% | 13 | 32 (1.00 d) | 46 |
| 2. Pre-Cut Branch Line Hoist | 658 s | 12 min | 93% | 97.6% | 10 | 42 (1.31 d) | 34 |
| 3. K25 ESFR Head & Drop Torque | 903 s | 20 min | 85% | 93.8% | 10 | 58 (1.81 d) | 20 |
| 4. 14-Bar 2-Hr Hydrostatic Test | 624 s | 8 min | 95% | 97.4% | 6 | 29 (0.91 d) | 36 |
| 5. NFPA Flow & Pump Commission | 439 s | 5 min | 97% | 98.8% | 5 | 16 (0.50 d) | 55 |
Key figures
- Takt time
- 844 s
- Lead time
- 6.24 d
- Value-added time
- 3,147 s
- Process cycle efficiency (PCE)
- 1.9%
- Rolled throughput yield (RTY)
- 86.7%
- Customer demand per day
- 32 rooms
- Line capacity per day
- 20 rooms
- Bottleneck
- K25 ESFR Head & Drop Torque
Reading the bottleneck
The bottleneck is "K25 ESFR Head & Drop Torque": it can process 20 rooms per day against a demand of 32 rooms, so it falls short of demand by 36.1%. Once downtime and scrap are counted, its cycle time grows from 903 s to 1,133 s, against a takt of 844 s. The largest loss at this step is equipment downtime (uptime 85%), about 159 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Commercial Building MEP & Fit-Out Trades: Commercial Building MEP & Fit-Out Trades
- Grade-A Office Tower Floor MEP First-Fix Takt
- High-Rise Acoustic Double-Board Drywall Train
- Bio-Pharma Cleanroom Stainless Exhaust Ducting
- Food & Pharma Seamless Polyurethane Screed Floor
- 10m/s Gearless High-Rise Elevator Shaft Install
- Smart Building BACnet / KNX HVAC Commissioning
- 500kW Commercial Flat-Roof Ballasted Solar Fit
- Industrial Refinery Turnaround Scaffold Build
- Multi-Tier Heavy Warehouse Steel Mezzanine
- Frameless Acoustic Office Glass Partitioning
- 70-Meter Internal Climbing Tower Crane Erection