Food & Pharma Seamless Polyurethane Screed Floor
Product family: HACCP Thermal-Shock Floors.
Flow: Polyurethane Floor Resin Kits → Diamond Shot-Blast & Anchor → Cove Skirting Trowel Form → 6mm Thermal Trowel Pour → Spiked Roller De-Air & Quartz → 24-Hr Rapid Forklift Cure → Food & Beverage Plants
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Diamond Shot-Blast & Anchor | 698 s | 10 min | 96% | 98.4% | 10 | 24 (1.00 d) | 35 |
| 2. Cove Skirting Trowel Form | 878 s | 12 min | 93% | 97.6% | 7 | 31 (1.29 d) | 25 |
| 3. 6mm Thermal Trowel Pour | 1,204 s | 20 min | 85% | 93.8% | 7 | 43 (1.79 d) | 15 |
| 4. Spiked Roller De-Air & Quartz | 833 s | 8 min | 95% | 97.4% | 5 | 22 (0.92 d) | 27 |
| 5. 24-Hr Rapid Forklift Cure | 585 s | 5 min | 97% | 98.8% | 4 | 12 (0.50 d) | 41 |
Key figures
- Takt time
- 1,125 s
- Lead time
- 6.24 d
- Value-added time
- 4,198 s
- Process cycle efficiency (PCE)
- 2.5%
- Rolled throughput yield (RTY)
- 86.7%
- Customer demand per day
- 24 rooms
- Line capacity per day
- 15 rooms
- Bottleneck
- 6mm Thermal Trowel Pour
Reading the bottleneck
The bottleneck is "6mm Thermal Trowel Pour": it can process 15 rooms per day against a demand of 24 rooms, so it falls short of demand by 36.9%. Once downtime and scrap are counted, its cycle time grows from 1,204 s to 1,510 s, against a takt of 1,125 s. The largest loss at this step is equipment downtime (uptime 85%), about 212 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Commercial Building MEP & Fit-Out Trades: Commercial Building MEP & Fit-Out Trades
- Grade-A Office Tower Floor MEP First-Fix Takt
- High-Rise Acoustic Double-Board Drywall Train
- Bio-Pharma Cleanroom Stainless Exhaust Ducting
- Warehouse ESFR High-Hazard Fire Sprinkler Grid
- 10m/s Gearless High-Rise Elevator Shaft Install
- Smart Building BACnet / KNX HVAC Commissioning
- 500kW Commercial Flat-Roof Ballasted Solar Fit
- Industrial Refinery Turnaround Scaffold Build
- Multi-Tier Heavy Warehouse Steel Mezzanine
- Frameless Acoustic Office Glass Partitioning
- 70-Meter Internal Climbing Tower Crane Erection