500kW Commercial Flat-Roof Ballasted Solar Fit

Product family: Zero-Penetration Rooftop Array.

Flow: Tier-1 Bifacial PV & Racking → Roof Crane Material Lift & Layout → Protective EPDM Mat & Ballast → Module Clamp & DC Micro-Wire → Combiner, Inverter & AC Tie → IV Curve, Thermal Drone & Grid → Warehouse REIT Roofs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 500kW Commercial Flat-Roof Ballasted Solar FitSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Tier-1 Bifacial PV & Racking → Roof Crane Material Lift & Layout (930 s) → Protective EPDM Mat & Ballast (1,170 s) → Module Clamp & DC Micro-Wire (1,605 s) → Combiner, Inverter & AC Tie (1,110 s) → IV Curve, Thermal Drone & Grid (780 s) → Warehouse REIT Roofs.SUPPLIERTier-1 BifacialPV & RackingI1.00 d1Roof CraneMaterial Lift &…C/T 930 sI1.28 d2Protective EPDMMat & BallastC/T 1,170 sI1.78 d3Module Clamp & DCMicro-WireC/T 1,605 sI0.89 d4Combiner,Inverter & AC TieC/T 1,110 sI0.50 d5IV Curve, ThermalDrone & GridC/T 780 sI0.61 dCUSTOMERWarehouse REITRoofs18 / skids

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Roof Crane Material Lift & Layout930 s10 min96%98.4%718 (1.00 d)26
2. Protective EPDM Mat & Ballast1,170 s12 min93%97.6%523 (1.28 d)19
3. Module Clamp & DC Micro-Wire1,605 s20 min85%93.8%532 (1.78 d)11
4. Combiner, Inverter & AC Tie1,110 s8 min95%97.4%416 (0.89 d)21
5. IV Curve, Thermal Drone & Grid780 s5 min97%98.8%39 (0.50 d)31

Key figures

Takt time
1,500 s
Lead time
6.26 d
Value-added time
5,595 s
Process cycle efficiency (PCE)
3.3%
Rolled throughput yield (RTY)
86.7%
Customer demand per day
18 skids
Line capacity per day
11 skids
Bottleneck
Module Clamp & DC Micro-Wire

Reading the bottleneck

The bottleneck is "Module Clamp & DC Micro-Wire": it can process 11 skids per day against a demand of 18 skids, so it falls short of demand by 37.4%. Once downtime and scrap are counted, its cycle time grows from 1,605 s to 2,013 s, against a takt of 1,500 s. The largest loss at this step is equipment downtime (uptime 85%), about 283 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.