Frameless Acoustic Office Glass Partitioning

Product family: Double-Glazed Demountable Walls.

Flow: Laminated 46dB Glass Panes → Laser Plumb Floor & Ceiling → Acoustic Foam & Slim Channel → Vacuum Lifter Pane Placement → Full-Height Door Drop Seal → Joint Silicone & Clear Clean → Corporate HQ Fit-Outs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Frameless Acoustic Office Glass PartitioningSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Laminated 46dB Glass Panes → Laser Plumb Floor & Ceiling (441 s) → Acoustic Foam & Slim Channel (554 s) → Vacuum Lifter Pane Placement (760 s) → Full-Height Door Drop Seal (526 s) → Joint Silicone & Clear Clean (369 s) → Corporate HQ Fit-Outs.SUPPLIERLaminated 46dBGlass PanesI1.00 d1Laser Plumb Floor& CeilingC/T 441 sI1.29 d2Acoustic Foam &Slim ChannelC/T 554 sI1.79 d3Vacuum LifterPane PlacementC/T 760 sI0.89 d4Full-Height DoorDrop SealC/T 526 sI0.50 d5Joint Silicone &Clear CleanC/T 369 sI0.61 dCUSTOMERCorporate HQFit-Outs38 / rooms

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Laser Plumb Floor & Ceiling441 s10 min96%98.4%1538 (1.00 d)55
2. Acoustic Foam & Slim Channel554 s12 min93%97.6%1149 (1.29 d)40
3. Vacuum Lifter Pane Placement760 s20 min85%93.8%1168 (1.79 d)24
4. Full-Height Door Drop Seal526 s8 min95%97.4%834 (0.89 d)43
5. Joint Silicone & Clear Clean369 s5 min97%98.8%619 (0.50 d)65

Key figures

Takt time
711 s
Lead time
6.18 d
Value-added time
2,650 s
Process cycle efficiency (PCE)
1.6%
Rolled throughput yield (RTY)
86.7%
Customer demand per day
38 rooms
Line capacity per day
24 rooms
Bottleneck
Vacuum Lifter Pane Placement

Reading the bottleneck

The bottleneck is "Vacuum Lifter Pane Placement": it can process 24 rooms per day against a demand of 38 rooms, so it falls short of demand by 36.9%. Once downtime and scrap are counted, its cycle time grows from 760 s to 953 s, against a takt of 711 s. The largest loss at this step is equipment downtime (uptime 85%), about 134 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.