10m/s Gearless High-Rise Elevator Shaft Install

Product family: Scaffoldless Climbing Platform.

Flow: Lift Hoist Kits → Laser Plumb Shaft & Brackets → Guide Rail & Counterweight Run → Overhead PM Machine & Cables → Landing Door Sil & Cab Build → Dynamic Overspeed Drop Test → 40-Story Residential Towers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 10m/s Gearless High-Rise Elevator Shaft InstallSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Lift Hoist Kits → Laser Plumb Shaft & Brackets (2,790 s) → Guide Rail & Counterweight Run (3,510 s) → Overhead PM Machine & Cables (4,815 s) → Landing Door Sil & Cab Build (3,330 s) → Dynamic Overspeed Drop Test (2,340 s) → 40-Story Residential Towers.SUPPLIERLift Hoist KitsI1.00 d1Laser Plumb Shaft& BracketsC/T 2,790 sI1.33 d2Guide Rail &Counterweight RunC/T 3,510 sI1.83 d3Overhead PMMachine & CablesC/T 4,815 sI0.83 d4Landing Door Sil& Cab BuildC/T 3,330 sI0.50 d5Dynamic OverspeedDrop TestC/T 2,340 sI0.67 dCUSTOMER40-StoryResidential…6 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Laser Plumb Shaft & Brackets2,790 s10 min96%98.4%26 (1.00 d)9
2. Guide Rail & Counterweight Run3,510 s12 min93%97.6%28 (1.33 d)6
3. Overhead PM Machine & Cables4,815 s20 min85%93.8%211 (1.83 d)4
4. Landing Door Sil & Cab Build3,330 s8 min95%97.4%15 (0.83 d)7
5. Dynamic Overspeed Drop Test2,340 s5 min97%98.8%13 (0.50 d)11

Key figures

Takt time
4,500 s
Lead time
6.79 d
Value-added time
16,785 s
Process cycle efficiency (PCE)
9.2%
Rolled throughput yield (RTY)
86.7%
Customer demand per day
6 units
Line capacity per day
4 units
Bottleneck
Overhead PM Machine & Cables

Reading the bottleneck

The bottleneck is "Overhead PM Machine & Cables": it can process 4 units per day against a demand of 6 units, so it falls short of demand by 35.4%. Once downtime and scrap are counted, its cycle time grows from 4,815 s to 6,039 s, against a takt of 4,500 s. The largest loss at this step is equipment downtime (uptime 85%), about 850 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.