Industrial Refinery Turnaround Scaffold Build

Product family: Tagged Safe-Access Towers.

Flow: Ringlock Steel Scaffold Yard → 3D Field Sketch & Load Permit → Forklift Material Staging Zone → Tube/Ledger Base & Tie Build → Toe-Board, Guardrail & Ladder → Green Tag Scaffold Inspection → Petrochem Maintenance Sites

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Industrial Refinery Turnaround Scaffold BuildSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Ringlock Steel Scaffold Yard → 3D Field Sketch & Load Permit (372 s) → Forklift Material Staging Zone (468 s) → Tube/Ledger Base & Tie Build (642 s) → Toe-Board, Guardrail & Ladder (444 s) → Green Tag Scaffold Inspection (312 s) → Petrochem Maintenance Sites.SUPPLIERRinglock SteelScaffold YardI1.00 d13D Field Sketch &Load PermitC/T 372 sI1.31 d2Forklift MaterialStaging ZoneC/T 468 sI1.80 d3Tube/Ledger Base& Tie BuildC/T 642 sI0.91 d4Toe-Board,Guardrail &…C/T 444 sI0.51 d5Green TagScaffold…C/T 312 sI0.60 dCUSTOMERPetrochemMaintenance…45 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 3D Field Sketch & Load Permit372 s10 min96%98.4%1845 (1.00 d)65
2. Forklift Material Staging Zone468 s12 min93%97.6%1459 (1.31 d)48
3. Tube/Ledger Base & Tie Build642 s20 min85%93.8%1481 (1.80 d)29
4. Toe-Board, Guardrail & Ladder444 s8 min95%97.4%941 (0.91 d)51
5. Green Tag Scaffold Inspection312 s5 min97%98.8%723 (0.51 d)77

Key figures

Takt time
600 s
Lead time
6.22 d
Value-added time
2,238 s
Process cycle efficiency (PCE)
1.3%
Rolled throughput yield (RTY)
86.7%
Customer demand per day
45 cases
Line capacity per day
29 cases
Bottleneck
Tube/Ledger Base & Tie Build

Reading the bottleneck

The bottleneck is "Tube/Ledger Base & Tie Build": it can process 29 cases per day against a demand of 45 cases, so it falls short of demand by 36.1%. Once downtime and scrap are counted, its cycle time grows from 642 s to 805 s, against a takt of 600 s. The largest loss at this step is equipment downtime (uptime 85%), about 113 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.