40% RAP Recycled Hot-Mix Asphalt Drum Plant

Product family: Recycled Polymer Road Mix.

Flow: Milled Old Road RAP & Aggregate → Fractionated RAP Crush & Screen → Parallel Drum Heating & Dryer → Twin-Shaft Pugmill Bitumen Mix → Insulated Hot-Storage Silos → Tarp Tipper Weighbridge Load → Motorway Paving Crews

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 40% RAP Recycled Hot-Mix Asphalt Drum PlantSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Milled Old Road RAP & Aggregate → Fractionated RAP Crush & Screen (51.0 s) → Parallel Drum Heating & Dryer (85.0 s) → Twin-Shaft Pugmill Bitumen Mix (64.0 s) → Insulated Hot-Storage Silos (54.0 s) → Tarp Tipper Weighbridge Load (41.0 s) → Motorway Paving Crews.SUPPLIERMilled Old RoadRAP & AggregateI1.40 d1Fractionated RAPCrush & ScreenC/T 51.0 sI1.80 d2Parallel DrumHeating & DryerC/T 85.0 sI1.20 d3Twin-ShaftPugmill Bitumen…C/T 64.0 sI0.70 d4InsulatedHot-Storage SilosC/T 54.0 sI0.80 d5Tarp TipperWeighbridge LoadC/T 41.0 sI1.20 dCUSTOMERMotorway PavingCrews680 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Fractionated RAP Crush & Screen51.0 s20 min95%99.1%816952 (1.40 d)978
2. Parallel Drum Heating & Dryer85.0 s45 min84%96.4%1,0201,224 (1.80 d)497
3. Twin-Shaft Pugmill Bitumen Mix64.0 s15 min93%98.4%544816 (1.20 d)756
4. Insulated Hot-Storage Silos54.0 s5 min96%98.8%204476 (0.70 d)931
5. Tarp Tipper Weighbridge Load41.0 s8 min97%99.5%170544 (0.80 d)1,226

Key figures

Takt time
79.4 s
Lead time
7.11 d
Value-added time
295 s
Process cycle efficiency (PCE)
0.077%
Rolled throughput yield (RTY)
92.4%
Customer demand per day
680 tonnes
Line capacity per day
497 tonnes
Bottleneck
Parallel Drum Heating & Dryer

Reading the bottleneck

The bottleneck is "Parallel Drum Heating & Dryer": it can process 497 tonnes per day against a demand of 680 tonnes, so it falls short of demand by 26.9%. Once downtime and scrap are counted, its cycle time grows from 85.0 s to 105 s, against a takt of 79.4 s. The largest loss at this step is equipment downtime (uptime 84%), about 16.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.