Vertical Twin-Shaft Regenerative Quicklime Kiln
Product family: 95% Reactive CaO Industrial Lime.
Flow: High-Purity Calcium Quarry → Wash Screen & Skip Hoist Charge → PFR Twin-Shaft 1100°C Calciner → Hydrator Slaking / Milling → Silica-Free Sieve Classify → Bulk Silo & Pneumatic Load → Steel Mills, Water & AAC
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Wash Screen & Skip Hoist Charge | 100 s | 20 min | 95% | 99.1% | 624 | 728 (1.40 d) | 753 |
| 2. PFR Twin-Shaft 1100°C Calciner | 167 s | 45 min | 84% | 96.4% | 780 | 936 (1.80 d) | 384 |
| 3. Hydrator Slaking / Milling | 125 s | 15 min | 93% | 98.4% | 416 | 624 (1.20 d) | 585 |
| 4. Silica-Free Sieve Classify | 106 s | 5 min | 96% | 98.8% | 156 | 364 (0.70 d) | 716 |
| 5. Bulk Silo & Pneumatic Load | 81.0 s | 8 min | 97% | 99.5% | 130 | 416 (0.80 d) | 942 |
Key figures
- Takt time
- 156 s
- Lead time
- 7.11 d
- Value-added time
- 579 s
- Process cycle efficiency (PCE)
- 0.10%
- Rolled throughput yield (RTY)
- 92.4%
- Customer demand per day
- 520 tonnes
- Line capacity per day
- 384 tonnes
- Bottleneck
- PFR Twin-Shaft 1100°C Calciner
Reading the bottleneck
The bottleneck is "PFR Twin-Shaft 1100°C Calciner": it can process 384 tonnes per day against a demand of 520 tonnes, so it falls short of demand by 26.1%. Once downtime and scrap are counted, its cycle time grows from 167 s to 206 s, against a takt of 156 s. The largest loss at this step is equipment downtime (uptime 84%), about 31.8 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Cement, Concrete, Bricks & Materials: Cement, Concrete, Bricks & Materials
- 5,000-Ton/Day Low-Carbon LC3 Cement Kiln Plant
- 120m³/Hr Automated Ready-Mix Concrete Batch
- Autoclaved Aerated Concrete (AAC) Thermal Block
- 40% RAP Recycled Hot-Mix Asphalt Drum Plant
- 100m/min Fire & Moisture Gypsum Plasterboard
- 1050°C Tunnel Kiln Hollow Thermal Clay Brick
- Tile Adhesive & External Facade Dry-Mortar Tower
- Multi-Layer Colored Vibro-Pressed Granite Paver
- Pultruded Glass-Fiber Composite Corrosion Rebar
- Fiber-Cement Autoclaved Architectural Cladding
- Closed-Loop Manufactured Concrete Sand Wash