Multi-Layer Colored Vibro-Pressed Granite Paver

Product family: Permeable Interlock Road Bricks.

Flow: Basalt Grit & Iron Pigments → Dual Base + Granite Face Mix → High-Freq Vibro Compaction Press → 24h Vapor Curing Rack Chamber → Shot-Blast Granite Texture Wash → Strapped Cube Yard Pallet → Municipal Paving Yards

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Multi-Layer Colored Vibro-Pressed Granite PaverSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Basalt Grit & Iron Pigments → Dual Base + Granite Face Mix (7.2 s) → High-Freq Vibro Compaction Press (12.0 s) → 24h Vapor Curing Rack Chamber (9.0 s) → Shot-Blast Granite Texture Wash (7.7 s) → Strapped Cube Yard Pallet (5.9 s) → Municipal Paving Yards.SUPPLIERBasalt Grit &Iron PigmentsI1.40 d1Dual Base +Granite Face MixC/T 7.2 sI1.80 d2High-Freq VibroCompaction PressC/T 12.0 sI1.20 d324h Vapor CuringRack ChamberC/T 9.0 sI0.70 d4Shot-BlastGranite Texture…C/T 7.7 sI0.80 d5Strapped CubeYard PalletC/T 5.9 sI1.20 dCUSTOMERMunicipalPaving Yards4,800 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Dual Base + Granite Face Mix7.2 s20 min95%99.1%5,7606,720 (1.40 d)6,930
2. High-Freq Vibro Compaction Press12.0 s45 min84%96.4%7,2008,640 (1.80 d)3,522
3. 24h Vapor Curing Rack Chamber9.0 s15 min93%98.4%3,8405,760 (1.20 d)5,376
4. Shot-Blast Granite Texture Wash7.7 s5 min96%98.8%1,4403,360 (0.70 d)6,528
5. Strapped Cube Yard Pallet5.9 s8 min97%99.5%1,2003,840 (0.80 d)8,519

Key figures

Takt time
11.3 s
Lead time
7.10 d
Value-added time
41.8 s
Process cycle efficiency (PCE)
0.011%
Rolled throughput yield (RTY)
92.4%
Customer demand per day
4,800 parts
Line capacity per day
3,522 parts
Bottleneck
High-Freq Vibro Compaction Press

Reading the bottleneck

The bottleneck is "High-Freq Vibro Compaction Press": it can process 3,522 parts per day against a demand of 4,800 parts, so it falls short of demand by 26.6%. Once downtime and scrap are counted, its cycle time grows from 12.0 s to 14.8 s, against a takt of 11.3 s. The largest loss at this step is equipment downtime (uptime 84%), about 2.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.