Fiber-Cement Autoclaved Architectural Cladding
Product family: Through-Colored Rainscreen.
Flow: Cellulose, Silica & Cement → Hatschek Multi-Vat Sieve Film → Accumulator Roll Stack Press → 180°C Autoclave Cure Harden → Diamond Cut & UV Acrylic Coat → Interleaved Crated Stack → Commercial Cladding Sites
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Hatschek Multi-Vat Sieve Film | 14.4 s | 20 min | 95% | 99.1% | 2,880 | 3,360 (1.40 d) | 3,465 |
| 2. Accumulator Roll Stack Press | 24.1 s | 45 min | 84% | 96.4% | 3,600 | 4,320 (1.80 d) | 1,754 |
| 3. 180°C Autoclave Cure Harden | 18.0 s | 15 min | 93% | 98.4% | 1,920 | 2,880 (1.20 d) | 2,688 |
| 4. Diamond Cut & UV Acrylic Coat | 15.3 s | 5 min | 96% | 98.8% | 720 | 1,680 (0.70 d) | 3,286 |
| 5. Interleaved Crated Stack | 11.7 s | 8 min | 97% | 99.5% | 600 | 1,920 (0.80 d) | 4,296 |
Key figures
- Takt time
- 22.5 s
- Lead time
- 7.10 d
- Value-added time
- 83.5 s
- Process cycle efficiency (PCE)
- 0.022%
- Rolled throughput yield (RTY)
- 92.4%
- Customer demand per day
- 2,400 parts
- Line capacity per day
- 1,754 parts
- Bottleneck
- Accumulator Roll Stack Press
Reading the bottleneck
The bottleneck is "Accumulator Roll Stack Press": it can process 1,754 parts per day against a demand of 2,400 parts, so it falls short of demand by 26.9%. Once downtime and scrap are counted, its cycle time grows from 24.1 s to 29.8 s, against a takt of 22.5 s. The largest loss at this step is equipment downtime (uptime 84%), about 4.6 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Cement, Concrete, Bricks & Materials: Cement, Concrete, Bricks & Materials
- 5,000-Ton/Day Low-Carbon LC3 Cement Kiln Plant
- 120m³/Hr Automated Ready-Mix Concrete Batch
- Autoclaved Aerated Concrete (AAC) Thermal Block
- 40% RAP Recycled Hot-Mix Asphalt Drum Plant
- 100m/min Fire & Moisture Gypsum Plasterboard
- 1050°C Tunnel Kiln Hollow Thermal Clay Brick
- Tile Adhesive & External Facade Dry-Mortar Tower
- Multi-Layer Colored Vibro-Pressed Granite Paver
- Pultruded Glass-Fiber Composite Corrosion Rebar
- Vertical Twin-Shaft Regenerative Quicklime Kiln
- Closed-Loop Manufactured Concrete Sand Wash