Expandable Solar-Powered Mobile Clinic Unit

Product family: Field Diagnostics & Tele-Health.

Flow: Medical Gas & X-Ray Lead → Hydraulic Slide-Out Frame → Lead-Lined X-Ray & O2 Pipe → Roof Solar PV & LiFePO4 UPS → Exam Bed, Lab Bench & AHU Fit → Roadworthy & Clinician Sign → Rural Health & NGOs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Expandable Solar-Powered Mobile Clinic UnitSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Medical Gas & X-Ray Lead → Hydraulic Slide-Out Frame (4,388 s) → Lead-Lined X-Ray & O2 Pipe (4,860 s) → Roof Solar PV & LiFePO4 UPS (7,223 s) → Exam Bed, Lab Bench & AHU Fit (5,400 s) → Roadworthy & Clinician Sign (3,645 s) → Rural Health & NGOs.SUPPLIERMedical Gas &X-Ray LeadI1.50 d1HydraulicSlide-Out FrameC/T 4,388 sI1.25 d2Lead-Lined X-Ray& O2 PipeC/T 4,860 sI2.00 d3Roof Solar PV &LiFePO4 UPSC/T 7,223 sI1.00 d4Exam Bed, LabBench & AHU FitC/T 5,400 sI0.50 d5Roadworthy &Clinician SignC/T 3,645 sI0.75 dCUSTOMERRural Health &NGOs4 / modules

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Hydraulic Slide-Out Frame4,388 s35 min93%98.2%36 (1.50 d)5
2. Lead-Lined X-Ray & O2 Pipe4,860 s20 min94%97.6%25 (1.25 d)5
3. Roof Solar PV & LiFePO4 UPS7,223 s30 min86%93.0%28 (2.00 d)3
4. Exam Bed, Lab Bench & AHU Fit5,400 s15 min94%97.2%14 (1.00 d)4
5. Roadworthy & Clinician Sign3,645 s10 min97%99.1%12 (0.50 d)7

Key figures

Takt time
6,750 s
Lead time
7.95 d
Value-added time
25,516 s
Process cycle efficiency (PCE)
11.9%
Rolled throughput yield (RTY)
85.9%
Customer demand per day
4 modules
Line capacity per day
3 modules
Bottleneck
Roof Solar PV & LiFePO4 UPS

Reading the bottleneck

The bottleneck is "Roof Solar PV & LiFePO4 UPS": it can process 3 modules per day against a demand of 4 modules, so it falls short of demand by 35.2%. Once downtime and scrap are counted, its cycle time grows from 7,223 s to 9,031 s, against a takt of 6,750 s. The largest loss at this step is equipment downtime (uptime 86%), about 1,176 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.