Automated Gang-Nail Timber Roof Truss Line

Product family: Engineered Roof & Floor Joists.

Flow: C24 Kiln-Dried Pine → 5-Axis Automated Angle Saw → Laser Projection Jig Setup → Hydraulic Gang-Nail Press → Auto Stack & Roof Lot Banding → Site Forklift Banded Unload → Residential Homebuilders

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Automated Gang-Nail Timber Roof Truss LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. C24 Kiln-Dried Pine → 5-Axis Automated Angle Saw (125 s) → Laser Projection Jig Setup (139 s) → Hydraulic Gang-Nail Press (206 s) → Auto Stack & Roof Lot Banding (154 s) → Site Forklift Banded Unload (104 s) → Residential Homebuilders.SUPPLIERC24 Kiln-DriedPineI1.40 d15-Axis AutomatedAngle SawC/T 125 sI1.20 d2Laser ProjectionJig SetupC/T 139 sI2.00 d3HydraulicGang-Nail PressC/T 206 sI1.00 d4Auto Stack & RoofLot BandingC/T 154 sI0.60 d5Site ForkliftBanded UnloadC/T 104 sI0.80 dCUSTOMERResidentialHomebuilders140 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 5-Axis Automated Angle Saw125 s35 min93%98.2%112196 (1.40 d)178
2. Laser Projection Jig Setup139 s20 min94%97.6%70168 (1.20 d)162
3. Hydraulic Gang-Nail Press206 s30 min86%93.0%56280 (2.00 d)87
4. Auto Stack & Roof Lot Banding154 s15 min94%97.2%42140 (1.00 d)142
5. Site Forklift Banded Unload104 s10 min97%99.1%3584 (0.60 d)227

Key figures

Takt time
193 s
Lead time
7.03 d
Value-added time
728 s
Process cycle efficiency (PCE)
0.38%
Rolled throughput yield (RTY)
85.9%
Customer demand per day
140 parts
Line capacity per day
87 parts
Bottleneck
Hydraulic Gang-Nail Press

Reading the bottleneck

The bottleneck is "Hydraulic Gang-Nail Press": it can process 87 parts per day against a demand of 140 parts, so it falls short of demand by 37.6%. Once downtime and scrap are counted, its cycle time grows from 206 s to 258 s, against a takt of 193 s. The largest loss at this step is equipment downtime (uptime 86%), about 33.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Modular Construction & Offsite Prefab: Modular Construction & Offsite Prefab