Turnkey BSL-3 / GMP Modular Cleanroom Pod

Product family: Pre-Commissioned Pharma Suites.

Flow: HEPA Filter & HPL Walls → Steel Chassis & Airlock Weld → Flush GMP Wall & Cove Vinyl → HEPA Ceiling & DDC Controls → Smoke Pattern & Particle Test → Air-Tight Ship Wrap to Site → Biotech & Cell Therapy Fabs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Turnkey BSL-3 / GMP Modular Cleanroom PodSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. HEPA Filter & HPL Walls → Steel Chassis & Airlock Weld (4,388 s) → Flush GMP Wall & Cove Vinyl (4,860 s) → HEPA Ceiling & DDC Controls (7,223 s) → Smoke Pattern & Particle Test (5,400 s) → Air-Tight Ship Wrap to Site (3,645 s) → Biotech & Cell Therapy Fabs.SUPPLIERHEPA Filter &HPL WallsI1.50 d1Steel Chassis &Airlock WeldC/T 4,388 sI1.25 d2Flush GMP Wall &Cove VinylC/T 4,860 sI2.00 d3HEPA Ceiling &DDC ControlsC/T 7,223 sI1.00 d4Smoke Pattern &Particle TestC/T 5,400 sI0.50 d5Air-Tight ShipWrap to SiteC/T 3,645 sI0.75 dCUSTOMERBiotech & CellTherapy Fabs4 / modules

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Steel Chassis & Airlock Weld4,388 s35 min93%98.2%36 (1.50 d)5
2. Flush GMP Wall & Cove Vinyl4,860 s20 min94%97.6%25 (1.25 d)5
3. HEPA Ceiling & DDC Controls7,223 s30 min86%93.0%28 (2.00 d)3
4. Smoke Pattern & Particle Test5,400 s15 min94%97.2%14 (1.00 d)4
5. Air-Tight Ship Wrap to Site3,645 s10 min97%99.1%12 (0.50 d)7

Key figures

Takt time
6,750 s
Lead time
7.95 d
Value-added time
25,516 s
Process cycle efficiency (PCE)
11.9%
Rolled throughput yield (RTY)
85.9%
Customer demand per day
4 modules
Line capacity per day
3 modules
Bottleneck
HEPA Ceiling & DDC Controls

Reading the bottleneck

The bottleneck is "HEPA Ceiling & DDC Controls": it can process 3 modules per day against a demand of 4 modules, so it falls short of demand by 35.2%. Once downtime and scrap are counted, its cycle time grows from 7,223 s to 9,031 s, against a takt of 6,750 s. The largest loss at this step is equipment downtime (uptime 86%), about 1,176 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Modular Construction & Offsite Prefab: Modular Construction & Offsite Prefab