Unitized Curtain-Wall Aluminum-Glass Facade

Product family: Triple-Glazed Tower Units.

Flow: Aluminium Facade Profiles & Glass → 4-Axis Al Frame Cut & Crimp → EPDM Gasket & Corner Vulc → IGU Structural Silicone Glaze → Weather Cure & Water AAMA QC → Stillage Sequence Crane Hoist → High-Rise Skyscrapers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Unitized Curtain-Wall Aluminum-Glass FacadeSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Aluminium Facade Profiles & Glass → 4-Axis Al Frame Cut & Crimp (540 s) → EPDM Gasket & Corner Vulc (598 s) → IGU Structural Silicone Glaze (889 s) → Weather Cure & Water AAMA QC (665 s) → Stillage Sequence Crane Hoist (449 s) → High-Rise Skyscrapers.SUPPLIERAluminiumFacade Profiles& GlassI1.40 d14-Axis Al FrameCut & CrimpC/T 540 sI1.20 d2EPDM Gasket &Corner VulcC/T 598 sI2.00 d3IGU StructuralSilicone GlazeC/T 889 sI1.00 d4Weather Cure &Water AAMA QCC/T 665 sI0.60 d5Stillage SequenceCrane HoistC/T 449 sI0.80 dCUSTOMERHigh-RiseSkyscrapers65 / modules

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 4-Axis Al Frame Cut & Crimp540 s35 min93%98.2%5291 (1.40 d)87
2. EPDM Gasket & Corner Vulc598 s20 min94%97.6%3378 (1.20 d)79
3. IGU Structural Silicone Glaze889 s30 min86%93.0%26130 (2.00 d)45
4. Weather Cure & Water AAMA QC665 s15 min94%97.2%2065 (1.00 d)70
5. Stillage Sequence Crane Hoist449 s10 min97%99.1%1639 (0.60 d)110

Key figures

Takt time
831 s
Lead time
7.06 d
Value-added time
3,141 s
Process cycle efficiency (PCE)
0.82%
Rolled throughput yield (RTY)
85.9%
Customer demand per day
65 modules
Line capacity per day
45 modules
Bottleneck
IGU Structural Silicone Glaze

Reading the bottleneck

The bottleneck is "IGU Structural Silicone Glaze": it can process 45 modules per day against a demand of 65 modules, so it falls short of demand by 31.5%. Once downtime and scrap are counted, its cycle time grows from 889 s to 1,112 s, against a takt of 831 s. The largest loss at this step is equipment downtime (uptime 86%), about 145 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Modular Construction & Offsite Prefab: Modular Construction & Offsite Prefab