Multi-Service Prefab Corridor & Riser Rack

Product family: Plug-and-Play Chilled & Bus.

Flow: Grooved Couplings & Cable Trays → BIM Clash-Free Frame Weld → Insulated Chilled Pipe & Braze → LV Tray, Busbar & Smoke Duct → Hydro Pressure & Insulation Test → Wheeled Skid Site Roll-In → Hospitals & Data Centers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Multi-Service Prefab Corridor & Riser RackSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Grooved Couplings & Cable Trays → BIM Clash-Free Frame Weld (975 s) → Insulated Chilled Pipe & Braze (1,080 s) → LV Tray, Busbar & Smoke Duct (1,605 s) → Hydro Pressure & Insulation Test (1,200 s) → Wheeled Skid Site Roll-In (810 s) → Hospitals & Data Centers.SUPPLIERGroovedCouplings &Cable TraysI1.39 d1BIM Clash-FreeFrame WeldC/T 975 sI1.22 d2Insulated ChilledPipe & BrazeC/T 1,080 sI2.00 d3LV Tray, Busbar &Smoke DuctC/T 1,605 sI1.00 d4Hydro Pressure &Insulation TestC/T 1,200 sI0.61 d5Wheeled Skid SiteRoll-InC/T 810 sI0.78 dCUSTOMERHospitals &Data Centers18 / assemblies

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. BIM Clash-Free Frame Weld975 s35 min93%98.2%1425 (1.39 d)23
2. Insulated Chilled Pipe & Braze1,080 s20 min94%97.6%922 (1.22 d)21
3. LV Tray, Busbar & Smoke Duct1,605 s30 min86%93.0%736 (2.00 d)11
4. Hydro Pressure & Insulation Test1,200 s15 min94%97.2%518 (1.00 d)18
5. Wheeled Skid Site Roll-In810 s10 min97%99.1%511 (0.61 d)29

Key figures

Takt time
1,500 s
Lead time
7.21 d
Value-added time
5,670 s
Process cycle efficiency (PCE)
2.9%
Rolled throughput yield (RTY)
85.9%
Customer demand per day
18 assemblies
Line capacity per day
11 assemblies
Bottleneck
LV Tray, Busbar & Smoke Duct

Reading the bottleneck

The bottleneck is "LV Tray, Busbar & Smoke Duct": it can process 11 assemblies per day against a demand of 18 assemblies, so it falls short of demand by 38.1%. Once downtime and scrap are counted, its cycle time grows from 1,605 s to 2,007 s, against a takt of 1,500 s. The largest loss at this step is equipment downtime (uptime 86%), about 261 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Modular Construction & Offsite Prefab: Modular Construction & Offsite Prefab