Hybrid Active Noise-Canceling Over-Ear Headset

Product family: 8-Mic Spatial Audio Cans.

Flow: Neodymium Drivers & Protein PU → 40mm Bio-Cellulose Driver → Acoustic Baffle Glue & Cure → ANC DSP + Mic Phase Match → Headband Spring & Pad Snap → Anechoic THD & ANC Curve QC → Consumer Electronics Retail

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Hybrid Active Noise-Canceling Over-Ear HeadsetSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Neodymium Drivers & Protein PU → 40mm Bio-Cellulose Driver (24.7 s) → Acoustic Baffle Glue & Cure (32.4 s) → ANC DSP + Mic Phase Match (41.0 s) → Headband Spring & Pad Snap (28.5 s) → Anechoic THD & ANC Curve QC (21.6 s) → Consumer Electronics Retail.SUPPLIERNeodymiumDrivers &Protein PUI1.30 d140mmBio-Cellulose…C/T 24.7 sI1.20 d2Acoustic BaffleGlue & CureC/T 32.4 sI1.60 d3ANC DSP + MicPhase MatchC/T 41.0 sI0.90 d4Headband Spring &Pad SnapC/T 28.5 sI0.70 d5Anechoic THD &ANC Curve QCC/T 21.6 sI1.50 dCUSTOMERConsumerElectronics…1,400 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 40mm Bio-Cellulose Driver24.7 s15 min96%98.9%8401,820 (1.30 d)2,018
2. Acoustic Baffle Glue & Cure32.4 s12 min93%97.6%4201,680 (1.20 d)1,446
3. ANC DSP + Mic Phase Match41.0 s15 min86%95.2%3502,240 (1.60 d)1,006
4. Headband Spring & Pad Snap28.5 s8 min95%98.8%3501,260 (0.90 d)1,715
5. Anechoic THD & ANC Curve QC21.6 s6 min98%99.6%280980 (0.70 d)2,359

Key figures

Takt time
38.6 s
Lead time
7.20 d
Value-added time
148 s
Process cycle efficiency (PCE)
0.038%
Rolled throughput yield (RTY)
90.4%
Customer demand per day
1,400 units
Line capacity per day
1,006 units
Bottleneck
ANC DSP + Mic Phase Match

Reading the bottleneck

The bottleneck is "ANC DSP + Mic Phase Match": it can process 1,006 units per day against a demand of 1,400 units, so it falls short of demand by 28.1%. Once downtime and scrap are counted, its cycle time grows from 41.0 s to 50.1 s, against a takt of 38.6 s. The largest loss at this step is equipment downtime (uptime 86%), about 6.7 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.