2D Area-Imager Rugged Warehouse RF Scanner
Product family: Long-Range UHF + 2D Readers.
Flow: Optics & Trigger Mold → 2D Scan Engine Active Aim → Trigger Microswitch PCB → Twin-Shot Elastomer Overmold → UHF RFID Antenna Tuning → Concrete 2m Tumble & Scan → 3PL Fulfillment Warehouses
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. 2D Scan Engine Active Aim | 36.4 s | 15 min | 96% | 98.9% | 570 | 1,235 (1.30 d) | 1,369 |
| 2. Trigger Microswitch PCB | 48.0 s | 12 min | 93% | 97.6% | 285 | 1,140 (1.20 d) | 976 |
| 3. Twin-Shot Elastomer Overmold | 61.0 s | 15 min | 86% | 95.2% | 238 | 1,520 (1.60 d) | 677 |
| 4. UHF RFID Antenna Tuning | 42.0 s | 8 min | 95% | 98.8% | 238 | 855 (0.90 d) | 1,164 |
| 5. Concrete 2m Tumble & Scan | 31.8 s | 6 min | 98% | 99.6% | 190 | 665 (0.70 d) | 1,602 |
Key figures
- Takt time
- 56.8 s
- Lead time
- 7.20 d
- Value-added time
- 219 s
- Process cycle efficiency (PCE)
- 0.056%
- Rolled throughput yield (RTY)
- 90.4%
- Customer demand per day
- 950 units
- Line capacity per day
- 677 units
- Bottleneck
- Twin-Shot Elastomer Overmold
Reading the bottleneck
The bottleneck is "Twin-Shot Elastomer Overmold": it can process 677 units per day against a demand of 950 units, so it falls short of demand by 28.8%. Once downtime and scrap are counted, its cycle time grows from 61.0 s to 74.5 s, against a takt of 56.8 s. The largest loss at this step is equipment downtime (uptime 86%), about 9.9 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Smart Devices, POS & Wearables: Smart Devices, POS & Wearables
- IP68 ATEX Field Rugged Enterprise Tablet
- Hybrid Active Noise-Canceling Over-Ear Headset
- 45MP Full-Frame IBIS Mirrorless Camera Body
- Sapphire-Glass ECG Biomedical Smartwatch Line
- ISO-15197 Connected Bluetooth Blood Glucometer
- 80mm High-Speed Cutter POS Receipt Printer
- Vapor-Chamber Liquid-Metal Pro Laptop Line
- Blue-Laser Metrology Handheld 3D Scanner
- Matter Wi-Fi Aluminum Smart HVAC Thermostat
- 24/7 High-Bright 3500-Nit Digital Totem Display
- IP68 Titanium Bone-Conduction Sport Headset