IP68 ATEX Field Rugged Enterprise Tablet

Product family: Sunlight-Readable Field Slates.

Flow: Magnesium-Alloy Diecast & Cover Glass → Die-Cast Frame Gasket Dispense → Mainboard, NFC & Heatpipe Fit → Cover Glass Optical Bond → Overmolded Drop-Bumper Torque → 1.8m Drop + Water Pressure QC → Field Utility & Logistics Ops

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: IP68 ATEX Field Rugged Enterprise TabletSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Magnesium-Alloy Diecast & Cover Glass → Die-Cast Frame Gasket Dispense (102 s) → Mainboard, NFC & Heatpipe Fit (133 s) → Cover Glass Optical Bond (170 s) → Overmolded Drop-Bumper Torque (118 s) → 1.8m Drop + Water Pressure QC (89.0 s) → Field Utility & Logistics Ops.SUPPLIERMagnesium-AlloyDiecast & CoverGlassI1.30 d1Die-Cast FrameGasket DispenseC/T 102 sI1.20 d2Mainboard, NFC &Heatpipe FitC/T 133 sI1.60 d3Cover GlassOptical BondC/T 170 sI0.90 d4OvermoldedDrop-Bumper…C/T 118 sI0.70 d51.8m Drop + WaterPressure QCC/T 89.0 sI1.50 dCUSTOMERField Utility &Logistics Ops340 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Die-Cast Frame Gasket Dispense102 s15 min96%98.9%204442 (1.30 d)489
2. Mainboard, NFC & Heatpipe Fit133 s12 min93%97.6%102408 (1.20 d)352
3. Cover Glass Optical Bond170 s15 min86%95.2%85544 (1.60 d)243
4. Overmolded Drop-Bumper Torque118 s8 min95%98.8%85306 (0.90 d)414
5. 1.8m Drop + Water Pressure QC89.0 s6 min98%99.6%68238 (0.70 d)572

Key figures

Takt time
159 s
Lead time
7.21 d
Value-added time
612 s
Process cycle efficiency (PCE)
0.16%
Rolled throughput yield (RTY)
90.4%
Customer demand per day
340 units
Line capacity per day
243 units
Bottleneck
Cover Glass Optical Bond

Reading the bottleneck

The bottleneck is "Cover Glass Optical Bond": it can process 243 units per day against a demand of 340 units, so it falls short of demand by 28.6%. Once downtime and scrap are counted, its cycle time grows from 170 s to 208 s, against a takt of 159 s. The largest loss at this step is equipment downtime (uptime 86%), about 27.7 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Smart Devices, POS & Wearables: Smart Devices, POS & Wearables