Sapphire-Glass ECG Biomedical Smartwatch Line

Product family: Multi-Sensor Health Wearables.

Flow: Titanium Cases & PPG LEDs → Micro-SIP Stacked Board → PPG Optical Resin Lens Mold → Ti Chassis & Sapphire Press → Laser Seal & Band Click → ECG Accuracy & 5ATM Water → Retail & Health Insurers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Sapphire-Glass ECG Biomedical Smartwatch LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Titanium Cases & PPG LEDs → Micro-SIP Stacked Board (18.5 s) → PPG Optical Resin Lens Mold (24.3 s) → Ti Chassis & Sapphire Press (31.0 s) → Laser Seal & Band Click (21.4 s) → ECG Accuracy & 5ATM Water (16.2 s) → Retail & Health Insurers.SUPPLIERTitanium Cases& PPG LEDsI1.30 d1Micro-SIP StackedBoardC/T 18.5 sI1.20 d2PPG Optical ResinLens MoldC/T 24.3 sI1.60 d3Ti Chassis &Sapphire PressC/T 31.0 sI0.90 d4Laser Seal & BandClickC/T 21.4 sI0.70 d5ECG Accuracy &5ATM WaterC/T 16.2 sI1.50 dCUSTOMERRetail & HealthInsurers2,800 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Micro-SIP Stacked Board18.5 s15 min96%98.9%1,6803,640 (1.30 d)4,080
2. PPG Optical Resin Lens Mold24.3 s12 min93%97.6%8403,360 (1.20 d)2,936
3. Ti Chassis & Sapphire Press31.0 s15 min86%95.2%7004,480 (1.60 d)2,044
4. Laser Seal & Band Click21.4 s8 min95%98.8%7002,520 (0.90 d)3,468
5. ECG Accuracy & 5ATM Water16.2 s6 min98%99.6%5601,960 (0.70 d)4,772

Key figures

Takt time
28.9 s
Lead time
7.20 d
Value-added time
111 s
Process cycle efficiency (PCE)
0.019%
Rolled throughput yield (RTY)
90.4%
Customer demand per day
2,800 units
Line capacity per day
2,044 units
Bottleneck
Ti Chassis & Sapphire Press

Reading the bottleneck

The bottleneck is "Ti Chassis & Sapphire Press": it can process 2,044 units per day against a demand of 2,800 units, so it falls short of demand by 27.0%. Once downtime and scrap are counted, its cycle time grows from 31.0 s to 37.9 s, against a takt of 28.9 s. The largest loss at this step is equipment downtime (uptime 86%), about 5.0 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.