45MP Full-Frame IBIS Mirrorless Camera Body

Product family: Mag-Alloy Weather-Sealed Bodies.

Flow: Image Sensor & Lens Mount Suppliers → Mag-Alloy Body 5-Axis Trim → 5-Axis Sensor Stabilization Jig → Sub-Micron Flange Shimming → Main PCB, EVF & Shutter Fit → Chart Focus & Dead-Pixel Cal → Pro Photography Market

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 45MP Full-Frame IBIS Mirrorless Camera BodySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Image Sensor & Lens Mount Suppliers → Mag-Alloy Body 5-Axis Trim (182 s) → 5-Axis Sensor Stabilization Jig (239 s) → Sub-Micron Flange Shimming (304 s) → Main PCB, EVF & Shutter Fit (210 s) → Chart Focus & Dead-Pixel Cal (159 s) → Pro Photography Market.SUPPLIERImage Sensor &Lens MountSuppliersI1.30 d1Mag-Alloy Body5-Axis TrimC/T 182 sI1.20 d25-Axis SensorStabilization JigC/T 239 sI1.60 d3Sub-Micron FlangeShimmingC/T 304 sI0.90 d4Main PCB, EVF &Shutter FitC/T 210 sI0.70 d5Chart Focus &Dead-Pixel CalC/T 159 sI1.50 dCUSTOMERPro PhotographyMarket190 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Mag-Alloy Body 5-Axis Trim182 s15 min96%98.9%114247 (1.30 d)274
2. 5-Axis Sensor Stabilization Jig239 s12 min93%97.6%57228 (1.20 d)196
3. Sub-Micron Flange Shimming304 s15 min86%95.2%48304 (1.60 d)136
4. Main PCB, EVF & Shutter Fit210 s8 min95%98.8%48171 (0.90 d)233
5. Chart Focus & Dead-Pixel Cal159 s6 min98%99.6%38133 (0.70 d)320

Key figures

Takt time
284 s
Lead time
7.22 d
Value-added time
1,094 s
Process cycle efficiency (PCE)
0.28%
Rolled throughput yield (RTY)
90.4%
Customer demand per day
190 units
Line capacity per day
136 units
Bottleneck
Sub-Micron Flange Shimming

Reading the bottleneck

The bottleneck is "Sub-Micron Flange Shimming": it can process 136 units per day against a demand of 190 units, so it falls short of demand by 28.5%. Once downtime and scrap are counted, its cycle time grows from 304 s to 371 s, against a takt of 284 s. The largest loss at this step is equipment downtime (uptime 86%), about 49.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.