Vapor-Chamber Liquid-Metal Pro Laptop Line
Product family: Ultra-Thin Creator Workstations.
Flow: CNC Unibody Al & GPUs → Unibody Al Hinges & Keyboard → Motherboard & Liquid-Metal Fit → Vapor Chamber Flat Torque → Factory Color-Calibrated OLED → 4h Thermal Throttling Stress → E-Commerce & Retail Channels
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Unibody Al Hinges & Keyboard | 56.0 s | 15 min | 96% | 98.9% | 372 | 806 (1.30 d) | 890 |
| 2. Motherboard & Liquid-Metal Fit | 73.0 s | 12 min | 93% | 97.6% | 186 | 744 (1.20 d) | 642 |
| 3. Vapor Chamber Flat Torque | 93.0 s | 15 min | 86% | 95.2% | 155 | 992 (1.60 d) | 444 |
| 4. Factory Color-Calibrated OLED | 64.0 s | 8 min | 95% | 98.8% | 155 | 558 (0.90 d) | 764 |
| 5. 4h Thermal Throttling Stress | 49.0 s | 6 min | 98% | 99.6% | 124 | 434 (0.70 d) | 1,040 |
Key figures
- Takt time
- 87.1 s
- Lead time
- 7.21 d
- Value-added time
- 335 s
- Process cycle efficiency (PCE)
- 0.086%
- Rolled throughput yield (RTY)
- 90.4%
- Customer demand per day
- 620 units
- Line capacity per day
- 444 units
- Bottleneck
- Vapor Chamber Flat Torque
Reading the bottleneck
The bottleneck is "Vapor Chamber Flat Torque": it can process 444 units per day against a demand of 620 units, so it falls short of demand by 28.4%. Once downtime and scrap are counted, its cycle time grows from 93.0 s to 114 s, against a takt of 87.1 s. The largest loss at this step is equipment downtime (uptime 86%), about 15.1 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Smart Devices, POS & Wearables: Smart Devices, POS & Wearables
- IP68 ATEX Field Rugged Enterprise Tablet
- Hybrid Active Noise-Canceling Over-Ear Headset
- 45MP Full-Frame IBIS Mirrorless Camera Body
- Sapphire-Glass ECG Biomedical Smartwatch Line
- 2D Area-Imager Rugged Warehouse RF Scanner
- ISO-15197 Connected Bluetooth Blood Glucometer
- 80mm High-Speed Cutter POS Receipt Printer
- Blue-Laser Metrology Handheld 3D Scanner
- Matter Wi-Fi Aluminum Smart HVAC Thermostat
- 24/7 High-Bright 3500-Nit Digital Totem Display
- IP68 Titanium Bone-Conduction Sport Headset