IP68 Titanium Bone-Conduction Sport Headset

Product family: Open-Ear Swimming Audio.

Flow: Nickel-Titanium Memory Wire → NiTi Memory Band Insert → Micro-Transducer Winding → Liquid Silicone Injection → Ultrasonic Pogo-Pin Seal → 1.5m Chlorine Tank & Frequency → Sports & Endurance Brands

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: IP68 Titanium Bone-Conduction Sport HeadsetSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Nickel-Titanium Memory Wire → NiTi Memory Band Insert (18.2 s) → Micro-Transducer Winding (23.9 s) → Liquid Silicone Injection (30.4 s) → Ultrasonic Pogo-Pin Seal (21.0 s) → 1.5m Chlorine Tank & Frequency (15.9 s) → Sports & Endurance Brands.SUPPLIERNickel-TitaniumMemory WireI1.30 d1NiTi Memory BandInsertC/T 18.2 sI1.20 d2Micro-TransducerWindingC/T 23.9 sI1.60 d3Liquid SiliconeInjectionC/T 30.4 sI0.90 d4UltrasonicPogo-Pin SealC/T 21.0 sI0.70 d51.5m ChlorineTank & FrequencyC/T 15.9 sI1.50 dCUSTOMERSports &Endurance…1,900 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. NiTi Memory Band Insert18.2 s15 min96%98.9%1,1402,470 (1.30 d)2,739
2. Micro-Transducer Winding23.9 s12 min93%97.6%5702,280 (1.20 d)1,960
3. Liquid Silicone Injection30.4 s15 min86%95.2%4753,040 (1.60 d)1,357
4. Ultrasonic Pogo-Pin Seal21.0 s8 min95%98.8%4751,710 (0.90 d)2,328
5. 1.5m Chlorine Tank & Frequency15.9 s6 min98%99.6%3801,330 (0.70 d)3,204

Key figures

Takt time
28.4 s
Lead time
7.20 d
Value-added time
109 s
Process cycle efficiency (PCE)
0.028%
Rolled throughput yield (RTY)
90.4%
Customer demand per day
1,900 units
Line capacity per day
1,357 units
Bottleneck
Liquid Silicone Injection

Reading the bottleneck

The bottleneck is "Liquid Silicone Injection": it can process 1,357 units per day against a demand of 1,900 units, so it falls short of demand by 28.6%. Once downtime and scrap are counted, its cycle time grows from 30.4 s to 37.1 s, against a takt of 28.4 s. The largest loss at this step is equipment downtime (uptime 86%), about 4.9 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Smart Devices, POS & Wearables: Smart Devices, POS & Wearables