24/7 High-Bright 3500-Nit Digital Totem Display

Product family: Outdoor Anti-Glare Totems.

Flow: Open-Cell Display Glass → Open-Cell Optical Laminate → Multi-Zone Mini-LED Backlight → Sealed IP65 Heat-Exchanger → Optical Bonding Auto-Check → 72-Hour Solar Load Burn-In → Transit & Retail Malls

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 24/7 High-Bright 3500-Nit Digital Totem DisplaySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Open-Cell Display Glass → Open-Cell Optical Laminate (532 s) → Multi-Zone Mini-LED Backlight (698 s) → Sealed IP65 Heat-Exchanger (889 s) → Optical Bonding Auto-Check (615 s) → 72-Hour Solar Load Burn-In (465 s) → Transit & Retail Malls.SUPPLIEROpen-CellDisplay GlassI1.31 d1Open-Cell OpticalLaminateC/T 532 sI1.20 d2Multi-ZoneMini-LED…C/T 698 sI1.60 d3Sealed IP65Heat-ExchangerC/T 889 sI0.91 d4Optical BondingAuto-CheckC/T 615 sI0.71 d572-Hour SolarLoad Burn-InC/T 465 sI1.51 dCUSTOMERTransit &Retail Malls65 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Open-Cell Optical Laminate532 s15 min96%98.9%3985 (1.31 d)94
2. Multi-Zone Mini-LED Backlight698 s12 min93%97.6%2078 (1.20 d)67
3. Sealed IP65 Heat-Exchanger889 s15 min86%95.2%16104 (1.60 d)46
4. Optical Bonding Auto-Check615 s8 min95%98.8%1659 (0.91 d)79
5. 72-Hour Solar Load Burn-In465 s6 min98%99.6%1346 (0.71 d)110

Key figures

Takt time
831 s
Lead time
7.29 d
Value-added time
3,199 s
Process cycle efficiency (PCE)
0.81%
Rolled throughput yield (RTY)
90.4%
Customer demand per day
65 units
Line capacity per day
46 units
Bottleneck
Sealed IP65 Heat-Exchanger

Reading the bottleneck

The bottleneck is "Sealed IP65 Heat-Exchanger": it can process 46 units per day against a demand of 65 units, so it falls short of demand by 28.7%. Once downtime and scrap are counted, its cycle time grows from 889 s to 1,086 s, against a takt of 831 s. The largest loss at this step is equipment downtime (uptime 86%), about 145 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.