80mm High-Speed Cutter POS Receipt Printer

Product family: 250mm/s Thermal Line Printers.

Flow: Thermal Printhead Suppliers → Guillotine Blade Mechanism → Platen Roller & Stepper Gear → Thermal Head Spring Load → USB/LAN/BT Logic Board Fit → 100-Cut Black-Mark Calibration → Retail & Hospitality Chains

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 80mm High-Speed Cutter POS Receipt PrinterSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Thermal Printhead Suppliers → Guillotine Blade Mechanism (31.4 s) → Platen Roller & Stepper Gear (41.0 s) → Thermal Head Spring Load (53.0 s) → USB/LAN/BT Logic Board Fit (36.3 s) → 100-Cut Black-Mark Calibration (27.5 s) → Retail & Hospitality Chains.SUPPLIERThermalPrintheadSuppliersI1.30 d1Guillotine BladeMechanismC/T 31.4 sI1.20 d2Platen Roller &Stepper GearC/T 41.0 sI1.60 d3Thermal HeadSpring LoadC/T 53.0 sI0.90 d4USB/LAN/BT LogicBoard FitC/T 36.3 sI0.70 d5100-CutBlack-Mark…C/T 27.5 sI1.50 dCUSTOMERRetail &Hospitality…1,100 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Guillotine Blade Mechanism31.4 s15 min96%98.9%6601,430 (1.30 d)1,587
2. Platen Roller & Stepper Gear41.0 s12 min93%97.6%3301,320 (1.20 d)1,142
3. Thermal Head Spring Load53.0 s15 min86%95.2%2751,760 (1.60 d)779
4. USB/LAN/BT Logic Board Fit36.3 s8 min95%98.8%275990 (0.90 d)1,347
5. 100-Cut Black-Mark Calibration27.5 s6 min98%99.6%220770 (0.70 d)1,853

Key figures

Takt time
49.1 s
Lead time
7.20 d
Value-added time
189 s
Process cycle efficiency (PCE)
0.049%
Rolled throughput yield (RTY)
90.4%
Customer demand per day
1,100 units
Line capacity per day
779 units
Bottleneck
Thermal Head Spring Load

Reading the bottleneck

The bottleneck is "Thermal Head Spring Load": it can process 779 units per day against a demand of 1,100 units, so it falls short of demand by 29.2%. Once downtime and scrap are counted, its cycle time grows from 53.0 s to 64.7 s, against a takt of 49.1 s. The largest loss at this step is equipment downtime (uptime 86%), about 8.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.