PCB SMT & Box-Build EMS VSM Scenarios
12 scenarios of PCB SMT & Box-Build EMS, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Solder Paste Print & SPI → High-Speed SMD Pick & Place → Reflow Oven & 3D AOI / X-Ray → Selective Wave & Conformal → ICT Bed-of-Nails & Box-Build. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| PCB SMT Pick-and-Place & Box Build | 2,400 boards per day | 2 | 22.5 s | 7.40 d | 0.022% | Reflow Oven & 3D AOI |
| Automotive ASIL-D EV BMS Mainboard SMT | 1,600 boards per day | 2 | 33.8 s | 7.40 d | 0.033% | Nitrogen Reflow & AXI X-Ray |
| 64T64R 5G Massive-MIMO Antenna PCB Line | 320 boards per day | 2 | 169 s | 7.41 d | 0.17% | Vapor Phase Reflow Oven |
| 77GHz Automotive ADAS Radar Sensor PCB | 2,100 boards per day | 3 | 38.6 s | 7.40 d | 0.025% | Vacuum Void-Free Reflow |
| ISO-13485 Medical Ultrasound Beamformer PCB | 220 boards per day | 2 | 245 s | 7.42 d | 0.24% | Nitrogen Convection + AXI |
| Dual-Socket AI GPU Server Motherboard | 480 boards per day | 3 | 169 s | 7.41 d | 0.11% | Nitrogen Reflow & 3D AXI |
| NB-IoT Ultrasonic Smart Water/Gas Meter | 4,800 units per day | 3 | 16.9 s | 7.40 d | 0.011% | Potting Gel Resin Encapsule |
| Three-Phase Industrial VFD Inverter Gate Board | 920 boards per day | 2 | 58.7 s | 7.40 d | 0.057% | Double-Wave & Pin Check |
| Modular DIN-Rail Industrial Safety PLC I/O | 1,900 units per day | 2 | 28.4 s | 7.40 d | 0.028% | Robotic Housing Snap-Fit |
| PCI-PTS Secure EMV Payment Terminal PCBA | 1,400 boards per day | 2 | 38.6 s | 7.40 d | 0.038% | BGA Underfill Dispense & Cure |
| Matter & Thread Smart Home Gateway Line | 3,600 units per day | 2 | 15.0 s | 7.40 d | 0.015% | Snap Case & Laser Barcode |
| Rigid-Flex Polyimide Satellite Bus Board | 45 boards per day | 1 | 600 s | 7.49 d | 1.2% | Vapor Phase Reflow & Wash |