64T64R 5G Massive-MIMO Antenna PCB Line

Product family: 24-Layer PTFE Hybrid Boards.

Flow: RF Laminate Substrate Suppliers → Heavy RF Solder Print → PA Module Precision Place → Vapor Phase Reflow Oven → Automated Cavity Shield Fit → PIM & S-Parameter VNA Test → Telecom RAN Integrators

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 64T64R 5G Massive-MIMO Antenna PCB LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. RF Laminate Substrate Suppliers → Heavy RF Solder Print (95.0 s) → PA Module Precision Place (138 s) → Vapor Phase Reflow Oven (181 s) → Automated Cavity Shield Fit (132 s) → PIM & S-Parameter VNA Test (115 s) → Telecom RAN Integrators.SUPPLIERRF LaminateSubstrateSuppliersI1.20 d1Heavy RF SolderPrintC/T 95.0 sI1.40 d2PA ModulePrecision PlaceC/T 138 sI1.80 d3Vapor PhaseReflow OvenC/T 181 sI1.00 d4Automated CavityShield FitC/T 132 sI0.80 d5PIM & S-ParameterVNA TestC/T 115 sI1.20 dCUSTOMERTelecom RANIntegrators320 / boards

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Heavy RF Solder Print95.0 s25 min95%98.6%256384 (1.20 d)514
2. PA Module Precision Place138 s35 min91%97.4%256448 (1.40 d)330
3. Vapor Phase Reflow Oven181 s45 min84%95.4%320576 (1.80 d)227
4. Automated Cavity Shield Fit132 s18 min93%98.1%128320 (1.00 d)355
5. PIM & S-Parameter VNA Test115 s15 min95%98.8%80256 (0.80 d)411

Key figures

Takt time
169 s
Lead time
7.41 d
Value-added time
661 s
Process cycle efficiency (PCE)
0.17%
Rolled throughput yield (RTY)
88.8%
Customer demand per day
320 boards
Line capacity per day
227 boards
Bottleneck
Vapor Phase Reflow Oven

Reading the bottleneck

The bottleneck is "Vapor Phase Reflow Oven": it can process 227 boards per day against a demand of 320 boards, so it falls short of demand by 29.0%. Once downtime and scrap are counted, its cycle time grows from 181 s to 226 s, against a takt of 169 s. The largest loss at this step is equipment downtime (uptime 84%), about 34.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.