NB-IoT Ultrasonic Smart Water/Gas Meter

Product family: 15-Year Battery RF Modules.

Flow: MCU & Lithium Cell Suppliers → High-Speed Chip Mounter SMT → Flow Sensor Reed Weld → Potting Gel Resin Encapsule → NB-IoT RF OTA Sensitivity → Laser QR & Hydraulic Box → Municipal Water Utilities

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: NB-IoT Ultrasonic Smart Water/Gas MeterSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. MCU & Lithium Cell Suppliers → High-Speed Chip Mounter SMT (9.5 s) → Flow Sensor Reed Weld (13.8 s) → Potting Gel Resin Encapsule (18.1 s) → NB-IoT RF OTA Sensitivity (13.2 s) → Laser QR & Hydraulic Box (11.5 s) → Municipal Water Utilities.SUPPLIERMCU & LithiumCell SuppliersI1.20 d1High-Speed ChipMounter SMTC/T 9.5 sI1.40 d2Flow Sensor ReedWeldC/T 13.8 sI1.80 d3Potting Gel ResinEncapsuleC/T 18.1 sI1.00 d4NB-IoT RF OTASensitivityC/T 13.2 sI0.80 d5Laser QR &Hydraulic BoxC/T 11.5 sI1.20 dCUSTOMERMunicipal WaterUtilities4,800 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. High-Speed Chip Mounter SMT9.5 s25 min95%98.6%3,8405,760 (1.20 d)7,802
2. Flow Sensor Reed Weld13.8 s35 min91%97.4%3,8406,720 (1.40 d)5,034
3. Potting Gel Resin Encapsule18.1 s45 min84%95.4%4,8008,640 (1.80 d)3,467
4. NB-IoT RF OTA Sensitivity13.2 s18 min93%98.1%1,9204,800 (1.00 d)5,412
5. Laser QR & Hydraulic Box11.5 s15 min95%98.8%1,2003,840 (0.80 d)6,317

Key figures

Takt time
16.9 s
Lead time
7.40 d
Value-added time
66.1 s
Process cycle efficiency (PCE)
0.011%
Rolled throughput yield (RTY)
88.8%
Customer demand per day
4,800 units
Line capacity per day
3,467 units
Bottleneck
Potting Gel Resin Encapsule

Reading the bottleneck

The bottleneck is "Potting Gel Resin Encapsule": it can process 3,467 units per day against a demand of 4,800 units, so it falls short of demand by 27.8%. Once downtime and scrap are counted, its cycle time grows from 18.1 s to 22.6 s, against a takt of 16.9 s. The largest loss at this step is equipment downtime (uptime 84%), about 3.4 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of PCB SMT & Box-Build EMS: PCB SMT & Box-Build EMS