Three-Phase Industrial VFD Inverter Gate Board

Product family: Opto-Isolated IGBT Drivers.

Flow: Power Module Suppliers → Heavy Solder Stencil Print → SMD & Transformer Auto-Insert → Double-Wave & Pin Check → HV Creeping Clear Varnish → 3.5kV Opto Isolation Test → Motor Drive Factories

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Three-Phase Industrial VFD Inverter Gate BoardSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Power Module Suppliers → Heavy Solder Stencil Print (32.9 s) → SMD & Transformer Auto-Insert (48.0 s) → Double-Wave & Pin Check (63.0 s) → HV Creeping Clear Varnish (46.0 s) → 3.5kV Opto Isolation Test (39.9 s) → Motor Drive Factories.SUPPLIERPower ModuleSuppliersI1.20 d1Heavy SolderStencil PrintC/T 32.9 sI1.40 d2SMD & TransformerAuto-InsertC/T 48.0 sI1.80 d3Double-Wave & PinCheckC/T 63.0 sI1.00 d4HV Creeping ClearVarnishC/T 46.0 sI0.80 d53.5kV OptoIsolation TestC/T 39.9 sI1.20 dCUSTOMERMotor DriveFactories920 / boards

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Heavy Solder Stencil Print32.9 s25 min95%98.6%7361,104 (1.20 d)1,484
2. SMD & Transformer Auto-Insert48.0 s35 min91%97.4%7361,288 (1.40 d)949
3. Double-Wave & Pin Check63.0 s45 min84%95.4%9201,656 (1.80 d)653
4. HV Creeping Clear Varnish46.0 s18 min93%98.1%368920 (1.00 d)1,017
5. 3.5kV Opto Isolation Test39.9 s15 min95%98.8%230736 (0.80 d)1,186

Key figures

Takt time
58.7 s
Lead time
7.40 d
Value-added time
230 s
Process cycle efficiency (PCE)
0.057%
Rolled throughput yield (RTY)
88.8%
Customer demand per day
920 boards
Line capacity per day
653 boards
Bottleneck
Double-Wave & Pin Check

Reading the bottleneck

The bottleneck is "Double-Wave & Pin Check": it can process 653 boards per day against a demand of 920 boards, so it falls short of demand by 29.1%. Once downtime and scrap are counted, its cycle time grows from 63.0 s to 78.6 s, against a takt of 58.7 s. The largest loss at this step is equipment downtime (uptime 84%), about 12.0 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.