Dual-Socket AI GPU Server Motherboard

Product family: 16-Layer High-Speed Servers.

Flow: Substrate PCB Fabricator → Step-Stencil BGA Print → Large LGA Socket Place → Nitrogen Reflow & 3D AXI → Cold-Plate & VR Heatsink Fit → MemTest & PCIe Gen5 Loop → Hyperscale Server Racks

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Dual-Socket AI GPU Server MotherboardSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Substrate PCB Fabricator → Step-Stencil BGA Print (95.0 s) → Large LGA Socket Place (138 s) → Nitrogen Reflow & 3D AXI (181 s) → Cold-Plate & VR Heatsink Fit (132 s) → MemTest & PCIe Gen5 Loop (115 s) → Hyperscale Server Racks.SUPPLIERSubstrate PCBFabricatorI1.20 d1Step-Stencil BGAPrintC/T 95.0 sI1.40 d2Large LGA SocketPlaceC/T 138 sI1.80 d3Nitrogen Reflow &3D AXIC/T 181 sI1.00 d4Cold-Plate & VRHeatsink FitC/T 132 sI0.80 d5MemTest & PCIeGen5 LoopC/T 115 sI1.20 dCUSTOMERHyperscaleServer Racks480 / boards

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Step-Stencil BGA Print95.0 s25 min95%98.6%384576 (1.20 d)780
2. Large LGA Socket Place138 s35 min91%97.4%384672 (1.40 d)503
3. Nitrogen Reflow & 3D AXI181 s45 min84%95.4%480864 (1.80 d)347
4. Cold-Plate & VR Heatsink Fit132 s18 min93%98.1%192480 (1.00 d)541
5. MemTest & PCIe Gen5 Loop115 s15 min95%98.8%120384 (0.80 d)632

Key figures

Takt time
169 s
Lead time
7.41 d
Value-added time
661 s
Process cycle efficiency (PCE)
0.11%
Rolled throughput yield (RTY)
88.8%
Customer demand per day
480 boards
Line capacity per day
347 boards
Bottleneck
Nitrogen Reflow & 3D AXI

Reading the bottleneck

The bottleneck is "Nitrogen Reflow & 3D AXI": it can process 347 boards per day against a demand of 480 boards, so it falls short of demand by 27.8%. Once downtime and scrap are counted, its cycle time grows from 181 s to 226 s, against a takt of 169 s. The largest loss at this step is equipment downtime (uptime 84%), about 34.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of PCB SMT & Box-Build EMS: PCB SMT & Box-Build EMS