77GHz Automotive ADAS Radar Sensor PCB

Product family: Millimeter-Wave Radar Modules.

Flow: RF MMIC & Laminate Suppliers → Laser Direct Solder Print → Sub-Micron MMIC Place → Vacuum Void-Free Reflow → Laser Weld Waveguide Radome → 77GHz Anechoic Target Sim → OEM Bumper Radar Tier-1

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 77GHz Automotive ADAS Radar Sensor PCBSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. RF MMIC & Laminate Suppliers → Laser Direct Solder Print (21.6 s) → Sub-Micron MMIC Place (31.6 s) → Vacuum Void-Free Reflow (41.0 s) → Laser Weld Waveguide Radome (30.1 s) → 77GHz Anechoic Target Sim (26.2 s) → OEM Bumper Radar Tier-1.SUPPLIERRF MMIC &LaminateSuppliersI1.20 d1Laser DirectSolder PrintC/T 21.6 sI1.40 d2Sub-Micron MMICPlaceC/T 31.6 sI1.80 d3Vacuum Void-FreeReflowC/T 41.0 sI1.00 d4Laser WeldWaveguide RadomeC/T 30.1 sI0.80 d577GHz AnechoicTarget SimC/T 26.2 sI1.20 dCUSTOMEROEM BumperRadar Tier-12,100 / boards

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Laser Direct Solder Print21.6 s25 min95%98.6%1,6802,520 (1.20 d)3,431
2. Sub-Micron MMIC Place31.6 s35 min91%97.4%1,6802,940 (1.40 d)2,198
3. Vacuum Void-Free Reflow41.0 s45 min84%95.4%2,1003,780 (1.80 d)1,530
4. Laser Weld Waveguide Radome30.1 s18 min93%98.1%8402,100 (1.00 d)2,373
5. 77GHz Anechoic Target Sim26.2 s15 min95%98.8%5251,680 (0.80 d)2,773

Key figures

Takt time
38.6 s
Lead time
7.40 d
Value-added time
151 s
Process cycle efficiency (PCE)
0.025%
Rolled throughput yield (RTY)
88.8%
Customer demand per day
2,100 boards
Line capacity per day
1,530 boards
Bottleneck
Vacuum Void-Free Reflow

Reading the bottleneck

The bottleneck is "Vacuum Void-Free Reflow": it can process 1,530 boards per day against a demand of 2,100 boards, so it falls short of demand by 27.1%. Once downtime and scrap are counted, its cycle time grows from 41.0 s to 51.2 s, against a takt of 38.6 s. The largest loss at this step is equipment downtime (uptime 84%), about 7.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.