ISO-13485 Medical Ultrasound Beamformer PCB

Product family: High-Density 30-Layer Imaging.

Flow: Multilayer PCB Fabricator → 01005 Paste Print & SPI → Twin-Head BGA Precision Place → Nitrogen Convection + AXI → Ultrasonic Aqueous Wash → Dielectric Medical Leakage → Medical Imaging OEMs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: ISO-13485 Medical Ultrasound Beamformer PCBSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Multilayer PCB Fabricator → 01005 Paste Print & SPI (137 s) → Twin-Head BGA Precision Place (201 s) → Nitrogen Convection + AXI (263 s) → Ultrasonic Aqueous Wash (191 s) → Dielectric Medical Leakage (167 s) → Medical Imaging OEMs.SUPPLIERMultilayer PCBFabricatorI1.20 d101005 Paste Print& SPIC/T 137 sI1.40 d2Twin-Head BGAPrecision PlaceC/T 201 sI1.80 d3NitrogenConvection + AXIC/T 263 sI1.00 d4UltrasonicAqueous WashC/T 191 sI0.80 d5DielectricMedical LeakageC/T 167 sI1.20 dCUSTOMERMedical ImagingOEMs220 / boards

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 01005 Paste Print & SPI137 s25 min95%98.6%176264 (1.20 d)356
2. Twin-Head BGA Precision Place201 s35 min91%97.4%176308 (1.40 d)227
3. Nitrogen Convection + AXI263 s45 min84%95.4%220396 (1.80 d)156
4. Ultrasonic Aqueous Wash191 s18 min93%98.1%88220 (1.00 d)245
5. Dielectric Medical Leakage167 s15 min95%98.8%55176 (0.80 d)283

Key figures

Takt time
245 s
Lead time
7.42 d
Value-added time
959 s
Process cycle efficiency (PCE)
0.24%
Rolled throughput yield (RTY)
88.8%
Customer demand per day
220 boards
Line capacity per day
156 boards
Bottleneck
Nitrogen Convection + AXI

Reading the bottleneck

The bottleneck is "Nitrogen Convection + AXI": it can process 156 boards per day against a demand of 220 boards, so it falls short of demand by 28.9%. Once downtime and scrap are counted, its cycle time grows from 263 s to 328 s, against a takt of 245 s. The largest loss at this step is equipment downtime (uptime 84%), about 50.1 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of PCB SMT & Box-Build EMS: PCB SMT & Box-Build EMS