Intelligent 42-Breaker Monitored Rack PDU

Product family: Cloud Cabinet Smart Strips.

Flow: Hydraulic Breaker Suppliers → Extruded Housing Punch & Mask → C13/C19 Outlet Busbar Solder → Per-Outlet Current Sensor PCB → SNMP / Redfish MAC Flash → Hipots, Earth Bond & Load Audit → Hyperscale Server Racks

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Intelligent 42-Breaker Monitored Rack PDUSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Hydraulic Breaker Suppliers → Extruded Housing Punch & Mask (87.0 s) → C13/C19 Outlet Busbar Solder (100 s) → Per-Outlet Current Sensor PCB (139 s) → SNMP / Redfish MAC Flash (103 s) → Hipots, Earth Bond & Load Audit (82.0 s) → Hyperscale Server Racks.SUPPLIERHydraulicBreakerSuppliersI1.70 d1Extruded HousingPunch & MaskC/T 87.0 sI1.50 d2C13/C19 OutletBusbar SolderC/T 100 sI2.00 d3Per-OutletCurrent Sensor…C/T 139 sI1.10 d4SNMP / RedfishMAC FlashC/T 103 sI0.80 d5Hipots, EarthBond & Load AuditC/T 82.0 sI1.40 dCUSTOMERHyperscaleServer Racks420 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Extruded Housing Punch & Mask87.0 s25 min95%99.1%420714 (1.70 d)568
2. C13/C19 Outlet Busbar Solder100 s20 min93%98.4%252630 (1.50 d)476
3. Per-Outlet Current Sensor PCB139 s18 min86%95.8%168840 (2.00 d)304
4. SNMP / Redfish MAC Flash103 s12 min93%97.6%105462 (1.10 d)450
5. Hipots, Earth Bond & Load Audit82.0 s10 min96%99.0%84336 (0.80 d)591

Key figures

Takt time
129 s
Lead time
8.51 d
Value-added time
511 s
Process cycle efficiency (PCE)
0.11%
Rolled throughput yield (RTY)
90.3%
Customer demand per day
420 units
Line capacity per day
304 units
Bottleneck
Per-Outlet Current Sensor PCB

Reading the bottleneck

The bottleneck is "Per-Outlet Current Sensor PCB": it can process 304 units per day against a demand of 420 units, so it falls short of demand by 27.6%. Once downtime and scrap are counted, its cycle time grows from 139 s to 169 s, against a takt of 129 s. The largest loss at this step is equipment downtime (uptime 86%), about 22.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Switchgear, UPS & Power Systems: Switchgear, UPS & Power Systems